|
Help
|
About
|
Sign Out
Home
Browse
Search
TIE 40612210000 (5)
DaneCounty-Planning
>
Tie Sheets
>
SCANNED & INDEXED
>
TIE SHEETS
>
TIE 40612210000 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2015 10:39:05 AM
Creation date
8/6/2015 2:09:50 PM
Metadata
Fields
Template:
Planning Records
Document_Type
Tie Sheets
Surveyor's_Name
Belongia, Kristin
Corner_Number
40612210000
Date
5/28/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DANE COUNTY PUBLIC LAND SURVEY MONUMENT RECORD <br /> This record shall show the location of the corner and shall include all of the following nine elements (a <br /> through j). <br /> (a)CORNER LOCATION MARK CORNER LOCATION <br /> SECTION NUMBER: 21/22/27/28 2 1 - 2 2 <br /> TOWNSHIP 06 NORTH, RANGE 12 EAST <br /> • <br /> DANE COUNTY COORDINATES <br /> NORTHING: )442,435.397} <br /> EASTING: }904,814.773} 2 8 2 7 <br /> HORIZONTAL DATUM &ADJUSTMENT: WISCONSIN COUNTY COORDINATES, DANE COUNTY, NAD 83 (2007) <br /> ORTHOMETRIC HEIGHT: VERTICAL DATUM: <br /> )XXX} — RECORDED AS PREVIOUSLY SURVEYED <br /> (b) Describe any record evidence, monument evidence, occupational evidence,testimonial evidence or any <br /> other material evidence you considered, and whether the monument was found or placed. <br /> Prior to highway reconstruction, I found and accepted a railroad spike at four inches below <br /> pavement grade also found by James M. Baker on June 21, 2012, as marking the location of the <br /> corner and found or set witness monuments as shown hereon. Corner monument will/has been <br /> destroyed by the STH 73 relocation project as of the date of this record. This record is to <br /> document the corner location and witness monuments during construction for perpetuation. <br /> (c)CORNER LOCATION SKETCH: In the sketch, provide reference ties to at least 4 witness monuments of <br /> lasting durable material. <br /> (d)The sketch shall include physical features surrounding the monument location sufficient to easily find the <br /> monument when in the general area,such as but not limited to utility poles, signs, trees, edges of forests or <br /> cropland,field lanes, water bodies, pavement, buildings, etc. Sketch shall also indicate north and scale, and <br /> include descriptions of symbols, in sketch or by legend. <br /> O = SET 1/2" REBAR W/ YELLOW CAP <br /> tic—FOUND 3/4" REBAR <br /> Q \ <br /> o��• ) <br /> `�sr ' {84.28' <br /> 84.37' <br /> 63.62' FOUND 1 1/4" DIA. IRON PIPE <br /> FOUND CONCRETE 163.61' <br /> MONUMENT WITH ; IN CONCRETE <br /> BRASS CAP ' <br /> (WISCONSIN HIGHWAY 1\ ' <br /> COMMISSION-1967) ;N FOUND RAILROAD SPIKE <br /> ' _ <br /> co <br /> FOUND 3/4" REBAR AT CENTER <br /> OF SIGN <br /> CORNER IDENTIFICATION NUMBER 40612210000 (28NE-6-12) <br />
The URL can be used to link to this page
Your browser does not support the video tag.