Laserfiche WebLink
FOUNDATION LOCATION SURVEY <br /> LOT 6, CREEK VIEW CROSSING, LOCATED IN THE SE 1/4 OF THE NW 1/4, <br /> SECTION 32, T9N, R1 1 E, CITY OF SUN PRAIRIE, DANE COUNTY, WISCONSIN <br /> PEBBLEBROOK TRAIL N <br /> -- _____-0- <br /> CA=04 11 36.E w .`• '. <br /> R=1250.00' ° W E <br /> LC=N83'54112"E_ — --- •� ��. <br /> 91.46 <br /> — — S <br /> N <br /> co <br /> BASIS OF BEARINGS <br /> 10.5' THE WEST LINE OF LOT 6 IS <br /> EXISTING RECORDED TO BEAR N00'00'59"W. <br /> 10.5'- CONCRETE <br /> FOUNDATION N <br /> N10.5' N SCALE <br /> •— 10.5' cV N N 1" = 40' <br /> w . . <br /> 0 20 40 80 <br /> _LOT 7_ <br /> _LOT 5_ LOT 6 0 <br /> 0 19,614 S.F. 0 <br /> .o O <br /> O 0 <br /> Z `n LEGEND <br /> N • 1-1/2" IRON PIPE (FOUND) <br /> 75' WETLANDS SETBACK <br /> (A5 PER PLAT) <br /> SURVEYOR <br /> PAULSON & ASSOCIATES, LLC <br /> Daniel A. Paulson <br /> - — - 136 W. Holum Street <br /> DeForest, WI 53532 <br /> a 40' STORM WATER EASEMENT <br /> 0 <br /> a <br /> IN 12' UTILITY EASEMENT BUILDER/CLIENT <br /> • • PREMIER BUILDERS <br /> Kevin Acker <br /> N89'49'42' W 90.95' 102 N. Holiday Drive <br /> Waunakee, WI 53597 <br /> LOT 1 C.S.M. NO. 7156 <br /> SURVEYOR'S CERTIFICATE <br /> I, Daniel A. Paulson, Professional Land Surveyor do hereby certify that, by the <br /> direction of Kevin Acker representative of Premier Builders, INC., I have surveyed <br /> and mapped LOT 6, Creek View Crossing; located in the SE 1/4 of the NW 1/4, S, AS /'4�' <br /> Section 32, Town 9 North, Range 11 East, City of Sun Prairie, Dane County, c, a ''°-r % <br /> Wisconsin and that the above map is a true representation thereof and shows the , 'c <br /> size and location of the property, its exterior boundaries and an existing concrete 4� \./ <0 <br /> foundation. <br /> L L I I I I I!,, LAND SURVEYING <br /> _ � \SC..NSA%,, DEFOREST,WI <br /> 4 — ................ ..2 DANIEL A. .8 60846.2523 <br /> i <br /> DANIEL A. PAULSON PLS-1699 PAULSON <br /> S-1699 = <br /> DEFOREST <br /> tics ►0 - ( '-t WI VOCEN RESIDENCE <br /> Date ',�9� ' •........-'y0 (PLOTTED 4-5-17) <br /> o J <br /> �i,,iSUR1L����` <br /> DRAFTED BY: T.W.P. SHEET 1 OF 1 FILE NO. 17-034 <br /> C)n-0011 9 C6 <br />