Laserfiche WebLink
<br />4. <br /> <br />Yahara: Operations shall cease no later than ten (10) years from the date of CUP approval. <br /> <br />Loewi: Operations shall sease terminate no later than ten (10) years from the date of CUP <br />approval. <br /> <br />5. The total disturbed excavated area of the site shall not exceed ten (10) acres. Prior to the <br />excavated area movina beyond the 1 a-acre limit. a minimum of 3 acres shall be reclaimed <br />per Chapter 74 prior to the continuation the mineral extraction operation. Proof of <br />reclamation shall be submitted to Dane County Zonina Division for approval. <br /> <br />6. <br /> <br />Yahara: The excavation/removal of minerals or aravel shall be prohibited within 10 feet of <br />the boundaries of the conditional use permit. <br /> <br />Loewi: The excavation/removal of minerals or aravel shall be prohibited within 20 feet of <br />the boundaries of the conditional use permit. <br /> <br />7. <br /> <br />Yahara: All hiahwalls exceedina 40 feet in heiaht shall be benched at the top of the wall as <br />depicted on the attached benchina plan dated June 11. 2010. The bench shall be <br />1 a-foot horizontal with a maximum of a 1 a-foot vertical drop. Benchina shall be <br />installed when the mineral extraction operation comes within 20 feet of the <br />conditional use permit boundaries. <br /> <br />Loewi: <br /> <br />All hiahwalls exceedina 40 feet in heiaht shall be benched at the top of the wall as <br />depicted on the attached benchina plan dated June 11. 2010. The bench shall be <br />1 a-foot horizontal with a maximum of a 1 a-foot vertical drop. Benchina shall be <br />installed when the mineral extraction operation comes within 30 feet of the <br />conditional use permit boundaries. <br /> <br />Reclamation shall be completed within one year after operation~h ~d' and shall <br />follow the operator's submitted reclamation plan. <br /> <br />Reclamation shall meet requirements of Chapter 74 Jl!!!!!..1 nty cop <br />Ordinances. V ~ . <br /> <br />10. The driveway accessing the subject site shall be paved'f;4" e <br />driveway in a dust free manner in accordance with!;. . a d. lations, and <br />shall clean any dust or mud tracked onto public roa <br /> <br />11. The operator and all haulers shall access the CU ite only through the existing access <br />point via the Norske Wood Products property. <br /> <br />12. The all access drives to the mineral extraction site shall have a aate securelv locked when <br />the extraction site is not in operation. The aate shall be posted with a sian desianatina <br />"NO TRESPASSING." <br /> <br />8. <br /> <br />9. <br /> <br />13. Hours of operation shall be from 6 a.m. to 6 p.m., Monday through Friday. Saturday <br />operations shall be from 6:00 a.m. to 2:00 p.m. No operations of any kind shall take place <br />on Sundays or legal holidays. <br /> <br />14. The operator shall comply with Subchapter VII, Blasting Resultants, of the State of <br />Wisconsin Department of Commerce Administrative Code. In particular, blasting levels <br />shall be kept below 0.5 inch/second peak particle velocity at frequencies below 40 Hz., as <br /> <br />H:\Zoning\ZLR\Conditional Use Permits\CUP #2135 proposed.doc <br /> <br />Page 2 of 4 <br />