|
Help
|
About
|
Sign Out
Home
Browse
Search
CUP 02135
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
CUPS 00001-02383
>
CUP 02135
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2011 7:44:01 AM
Creation date
8/18/2010 2:37:41 PM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
02135
Town
Vermont Township
Section Numbers
02
AccelaLink
DCPCUP-0000-02135
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />P.O. Box 277 Waunakee. Wisconsin 53597"()277 Phone 608-849-4162 fax 608-849-5062 <br /> <br />EROSION CONTROL AND <br />STORMW ATER MANAGEMENT PLAN <br /> <br />EROSION CONTROL MEASURES: <br /> <br />ENTRANCE: <br /> <br />The entrance to this site will have 200 feet of paved driveway, which will prevent <br />tracking of material onto public roads. All slopes are seeded with grasses to provide <br />cover. <br /> <br />BERMS: <br /> <br />- <br /> <br />The stripped soils will be separated in stock piles, the overburden will be stripped and <br />used as the ~ of the ~ the top soil will be used to top dress the berms. The top soil <br />and the subsoil will used in the final restoration. The berms will be constructed with a <br />depression that will serve as a sediment trap at the base of the berm. (See detail. The <br />berms will be seeded and mulched in the spring from May 15 to May 30.). If needed the <br />berm will have a buffer beyond the limits of the berm. This buffer will be seeded and <br />mulched. <br /> <br />SILT FENCING: <br /> <br />Silt Fencing is used as necessary when soils are being stripped and stockpiled. <br /> <br />STONE WEEPER.: <br /> <br />A stone weeper will be used to slow water velocity and tnlpany sediment as necessary. <br />The weeper will be built with 3 to 6 inch clear stone, with a depression in the middle and <br />higher at the slope of the ditch. The 'Wccj)C! will have.8 face with 1 to 2 inch stone. <br /> <br />1. <br />
The URL can be used to link to this page
Your browser does not support the video tag.