|
Help
|
About
|
Sign Out
Home
Browse
Search
CUP 02141
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
CUPS 00001-02383
>
CUP 02141
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2011 7:23:18 AM
Creation date
8/18/2010 2:44:39 PM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
2141
Town
Springfield Township
Section Numbers
35
AccelaLink
DCPCUP-0000-02141
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Description of <br />Operations: <br /> <br />Hours of <br />Operation: <br /> <br />Transportation <br />Routes: <br /> <br />Yahara Materials, Inc. proposes to site a portable <br />concrete batch plant owned and operated by Trierweiler <br />Construction of Marshfield, WI for the production of <br />concrete for paving operations on Park Street in the <br />Meinholz Quarry. The reason for placing the plant at the <br />quarry is to place mixing operations and aggregate <br />production on the same site. The plant that would be <br />used would be of the latest design and would meet all <br />state and federal regulations and environmental <br />standards. Our request is for a long-term permit that <br />would allow for placing portable concrete plants at the <br />quarry on temporary basis as projects in the area <br />demand. <br /> <br />Monday through Friday 6:00 a.m. to 7:00 p.m. <br />Saturday when necessary 6:00 a.m. to 2:00 p.m. <br />In addition, DOT specifications require paving operations <br />for this particular project to be performed at night. <br />Night operations will be kept to a minimum but are <br />necessary to complete the project. <br /> <br />The existing quarry entrance at 6750 Greenbriar Road <br />would be the only access to and from the quarry. Upon <br />leaving the quarry all traffic would proceed to Highway <br />12 and on to the job site. <br /> <br />R~tful~IY /sub!'"itted//, <br /> <br />lh,.~/.. .../1/- <br />Timothy GJ: egan <br />
The URL can be used to link to this page
Your browser does not support the video tag.