Laserfiche WebLink
<br />SCHEDULE: <br /> <br />All schedules are presented as an estimate, as work at this site is market driven, and <br />operational dates may vary as market demands dictate. <br /> <br />June 1, <br /> <br />Strip top soil and overburden, prepare and shape berms for <br />seeding. Construct the swale next to the berms. Direct the excess <br />of runoff into the quarry. <br /> <br />June 15, . <br /> <br />Seed and mulch berms and disturbed areas. <br /> <br />August 15, <br /> <br />Seeding established and repair the areas where new vegetation is <br />needed. <br /> <br />September 1, <br /> <br />Inspect all erosion control measures to insure effectiveness. <br /> <br />NOTE: <br />The site is internally draining, no road ditches are present at the site, no cross <br />section, runoff velocities, culverts, are applicable to this site. <br /> <br />Contact Person for Erosion Control Plan: <br /> <br />Tim Geoghegan <br />Yahara Materials, Inc. <br />P.O. Box 277 <br />Waunakee, WI 53597 <br /> <br />Telephone: 608-849-4162 <br /> <br />Sincerely, <br /> <br />Tim Geoghegan <br />Supervisor <br />. YAHARAMATERIALS,INC. <br /> <br />3 <br />