Laserfiche WebLink
<br />t- <br /> <br />Comprehensive Development Plan <br /> <br />PUBLIC REALM <br /> <br />Transit <br />Madison Metro Route 16 currently serves the complete perimeter of the site. Routes within the area are anticipated to remain <br />and continue to provide the same level of service as the campus is developed. Approximately one year ago the level of service <br />to the area was improved to the neighborhood and as development continues Madison Metro does not foresee a change in <br />routing. Additional transit alternatives, such as a potential commuter rail stop, will enhance workforce mobility from the surrounding <br />neighborhoods and offer employees increased access and another option for arriving at campus. <br /> <br />J~',J <br />I:Jdd <br /> <br /> <br />_,.,s.- <br />..ooo.e <br />.. mmm~": <br />mmm(D~j"fD <br />"".,.,. s.nb <br />".. JIIfI....,.", '''''''tI <br />o 4D t. .."; CD m <br />mmfD€rla;m <br />1'IIt..... <br />... ,..... Jlll-1IIIJ <br />(l)mID4.... & tDfl)f1) <br />fDfDmmClCDCl <br />CD '......"i mm -.3.) m <br />G)mmm <br /> <br />Municipal Services <br />The Novation Campus site lies within both the Town of Madison and the City of Fitchburg. The Cityrrown boundary at Maloney <br />Drive results in separate utility districts providing services to the site. Portions of the site south of Maloney Drive are currently part <br />of the City of Fitchburg. The majority of the site is in the Town of Madison which will ultimately be annexed to the City of Fitchburg. <br />An agreement called the "City of Madison, City of Fitchburg, and Town of Madison Cooperative Plan" lays out the boundaries and <br />conditions for the dissolution of the Town of Madison which will occur on October 30, 2022 or earlier. As part of this agreement, <br />municipal services to the site will be provided as identified below. <br /> <br />Water <br />Water service to the site is divided between two utility districts. Current Town of Madison properties are customers of Madison <br />Water Utility, and City of Fitchburg properties are customers of Fitchburg's Utility District City of Madison wells provide the water <br />supply for both utility districts. A metering pit located at the intersection of Maloney Drive and Rimrock Road measures the water <br />used by the Fitchburg Utility District. The water service and utility district boundaries within the project area are expected to remain <br />the same after redevelopment and annexation to the City of Fitchburg. <br /> <br />Wastewater <br />Wastewater collection for the existing Novation Campus development is primarily routed east to the sewer main under Rimrock <br />Road. The southwest portion of the site is currently routed to a Madison Metropolitan Sewer District (MMSD) interceptor that <br />runs along Highway 14 west of the site. The topography of the Novation Campus expansion area will allow wastewater from the <br />redeveloped site to be routed to the southwest into the MMSD interceptor. A likely connection point is the manhole south of Ski <br />Lane with an invert elevation of approximately 1.90, significantly lower than anticipated building elevations within the campus <br />expansion area. Town of Madison parcels are currently served by the Oakridge Sanitary Sewer Districti After annexation, the <br />Oakridge Sanitary Sewer District customers in this area will become customers of the Fitchburg Sewer Utility. <br /> <br />. <br />