|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-0000-01403
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
CUPS 00001-02383
>
DCPCUP-0000-01403
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2016 2:40:24 PM
Creation date
7/28/2011 11:40:10 AM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
01403
Town
Sun Prairie Township
Section Numbers
32
AccelaLink
DCPCUP-0000-01403
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
T � <br /> Tower Sites , Inc . ��: <br /> 1 .A <br /> April 22, 1997 APR 2 5 I <br /> Mr. Jim Gregorius <br /> Dane County Planning & Development, Zoning Division C.C. PLANNING&DEVELOPMENT <br /> Room 1 1 6 PROPERTY RECORDS <br /> City-County Building <br /> Madison, WI 53709 <br /> Dear Mr. Gregorius: <br /> On December 3, 1996, we applied to the Dane County Land Regulations & Records <br /> Department for a conditional use permit to construct a 190 foot telecommunications tower <br /> in the town of Sun Prairie to support antennas for several wireless services. Prior to our <br /> submission we made a written request to the Federal Aviation Administration to study the <br /> proposed application to see if it will affect navigable airspace in the area of our proposed <br /> tower. The FAA study process typically takes --; •nths to complete. On March 25, <br /> 1997 we were granted Conditional Use Permi #1403 or the installation of our facility. <br /> Subsequent to that FAA completed their study an. • -d a determination that the tower we <br /> were proposing could not exceed 177 feet above ground. We are now planning the <br /> construction of a 170 foot tower that can still hold at least three carriers, and allow 7 feet of <br /> room above the top for whip antennas. <br /> Our Conditional Use Permit currently states "tower...shall accommodate,at a minimum height <br /> of 190 feet above grade, the collocation of three additional antenna arrays...". We need the <br /> wording changed to reflect the actual height of 170 feet that will now be used for this <br /> structure. Please note that with a 170 foot tower the three additional antenna arrays cannot <br /> all be placed at the top, the wording should indicate the antenna arrays will be installed at <br /> various heights on the tower. Antenna arrays are typically spaced ten to twenty feet apart <br /> vertically on the tower, and so some of them will be at heights above grade of less than 170 <br /> feet. <br /> I understand this change to our C.U.P. will require a future discussion by the Dane County <br /> Zoning and Natural Resources Committee. Please forward our request for the change in <br /> height to that Committee. <br /> Sincerely, <br /> � z" Terry Michaels <br /> U` President <br /> 20015 West National Avenue * New Berlin, WI 53146 * (414) 679-2367 (414) <br />
The URL can be used to link to this page
Your browser does not support the video tag.