<br /> <br />..IU04 <br /> <br />Construction Schedule: <br /> <br /> <br />Install erosion control: August 1, 2011 <br />Begin grading: August 1, 2011 <br />Seed and mulch disturbed areas: August 15, 2011 <br />Site fully restored: October 14, 2011 <br /> <br />Erosion Control Notes <br /> <br />1. The COntractOr is,feSpQnsib1e','ror constnJction alld maintaining all erosion control fences <br />and other erosion cOntrOl measures until final acceptance of the work and the seeded <br />areas are well established. <br />2. Erosion conlrol measures shall be constructed prior 10 the commencement of other <br />construction. <br />S. All disluJbed area. shall be re-topsoiled to a minimum 6~nch depth, seeded. fertilized, <br />and mulched by the Contractor prior to final acceptance of the work. Sloped 3:1 and <br />greater shall be covered with Class 11 Type B Erosion malting and polymer. <br />4. The Contractor shall fumish and insJall erosion bales in accordance with the Delail <br />Drawings at locations shown. <br />5. The existing gravel driveway shan be used as the construction entrance and trael<ing pad. <br />The Contractor shan clean. seape or sweep all tracked soil from roadways at the end of <br />each work day. <br />6. All diSlUlbed areas shall be seeded with OIds Lawn See. Quick-To-Gro blend, or equa~ at <br />the rate of 4 lb.. per 1000 square feet Prior to seeding, the topsoil shan be thoroughly <br />loosened by disl<ing or other means, fertilized with10.11l.11l fertilizer at the rate of 51bs. <br />per 1000,squarefeet and mulched With dean straw mulch to a foosedepthof %" to 1 %'1_ <br />and at the rate of1.5 tons/acre. Mulch shaH be punched into the soil to a minimum depth <br />of2" using a mulch liner while traveling on the conlOur. <br />7. Silt fence or erosion bales shall be inslaHed around the downstream edges of all topsoil <br />st_piles. All tOpsoil s1od<piles remaining for longer than a ten (11l) dey period shall be <br />temporarily mulched by lhe Contractor. <br />S Temporary mulch shall be placed if disturbed areas will not be restored immediately after <br />rough grading. <br />9. Changes to the approved Erosion Control Plan shan be submitted and approved prior to <br />instanation. <br /> <br />Total Disturbed Area: 11,500 sq.ft. <br />New Impervious Surface: 2,400 sq.ft. <br /> <br /> <br />Stapelmann Shoreland EC <br />Permit Application <br />3565 STH 78 <br />Mount Horeb, WI 53572 <br /> <br />Figure 1: Site Layout <br />