|
<br />80'3"
<br />
<br />well
<br />
<br />o
<br />
<br />1 71 .40
<br />
<br />41'1"
<br />
<br />108.75
<br />
<br />SITE PLAN LOT 2
<br />60.88
<br />
<br />20'
<br />
<br />
<br />62'9"
<br />
<br />EXSmNG
<br />OUT BUILDING
<br />
<br />30'
<br />
<br />31.25
<br />
<br />
<br />
<br />40' 21'
<br />
<br />
<br />69'S"
<br />
<br />PROPOSED
<br />ADDITION
<br /><toOV\'
<br />
<br />85.18/"i
<br />,
<br />.
<br />.
<br />,
<br />,
<br />,
<br />,
<br />,
<br />.
<br />,
<br />,
<br />,
<br />.
<br />
<br />
<br />811"
<br />
<br />
<br />septic tank~
<br />
<br />ANDERSON CONSTRUCTION
<br />OREGON WI
<br />
<br />50'10"
<br />
<br />
<br />
<br />drive way
<br />
<br />112.5\
<br />
<br />drain feild
<br />
<br />125.31'
<br />
<br />40'
<br />
<br />47'
<br />4814 OREGON TRAIL
<br />OREGON WI
<br />
<br />~0.78
<br />
<br />.
<br />,
<br />,
<br />,
<br />,
<br />,
<br />.
<br />.
<br />,
<br />,
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />,
<br />,
<br />.
<br />.
<br />,
<br />.
<br />.
<br />,
<br />l~ OLD LOT LINE
<br />
<br />,
<br />,
<br />,
<br />,
<br />,
<br />,
<br />,
<br />.
<br />.
<br />.
<br />.
<br />,
<br />,
<br />,
<br />,
<br />,
<br />,
<br />,
<br />,
<br />.
<br />,
<br />,
<br />.
<br />,
<br />,
<br />.
<br />.
<br />,
<br />,
<br />1--115.61
<br />,
<br />.
<br />.
<br />.
<br />,
<br />.
<br />.
<br />.
<br />.
<br />,
<br />,
<br />,
<br />,
<br />.
<br />,
<br />,
<br />,
<br />.
<br />,
<br />.
<br />.
<br />,
<br />,
<br />,
<br />.
<br />.
<br />,
<br />,
<br />,
<br />,
<br />,
<br />,
<br />.
<br />,
<br />.
<br />.
<br />,
<br />.
<br />,
<br />.
<br />
<br />
<br />,
<br />,
<br />oj
<br />
<br />SITE PLAN
<br />1"::: 20'
<br />
|