Laserfiche WebLink
<br />y <br /> <br />C1 <br /> <br /> <br />27' - 4" <br /> <br /> <br /> <br /> <br /> <br />25' -51/4" <br /> <br />34' - 6 3/8" <br /> <br />2' -0" <br /> <br />LANDING <br /> <br />EXIT STAIR <br /> <br />G0) <br />SPRINKLERED <br /> <br />PUMP ROOM <br />(@) <br /> <br />85 SF <br />SPRINKLERED <br /> <br />eA6 <br /> <br />b <br /> <br /> <br />N <br /> <br /> <br />'r <br />~ <br /> <br />..' . <br /> <br />'" <br />, <br />'" <br /> <br />- , <br /> <br />" <br /> <br />(9) TREADS @ 1 1" <br />5' - 0" = 8' - 3" <br /> <br />.' <br /> <br />10 <br />~ <br />"- <br />12' - 1" ..,. <br /> <br />M N <br />'" <br /> <br />4 7/8" <br /> <br />S' <br /> <br /> <br />24' -0" <br /> <br />16 <br /> <br /> <br /> <br />A1~ <br /> <br />6' -0" <br /> <br />7' -0" <br /> <br />6' -0" <br /> <br />12'-0" <br />(FIELD VERIFY) <br /> <br />6' -0" <br /> <br />7' -0" <br /> <br />6'-0" <br /> <br />b <br />Co <br />..,. <br /> <br /> <br />b <br />en <br />, <br />:1 <br />15 <br />b <br />, <br />en <br /> <br />aD <br /> <br />= <br /> <br /> <br />FELLOWSHIP <br />@D <br />1309 SF <br />SPRINKLERED <br /> <br />,., <br /> <br /> <br /> <br /> <br />., ;.v <br /> <br />UNFINISHED FUT. <br />MEETING ROOM <br />SPACE <br /> <br />@) <br />1036 SF <br />SPRINKLERED <br /> <br />I <br />II <br />II <br /> <br />. <br /> <br />LOWER LEVEL <br />88' - 3" <br /> <br />~ <br /> <br />, <br /> <br /> <br /> ]' -0" II II <br /> II E1 II <br /> II-'''' 0 <br /> i " II II <br /> Ii \ EXIST. OFFICE <br /> EXP. II II <br /> C@D CORR, -1 I <br /> II II i <br /> 0 cf015~ II II KITCHENII~ <br /> EXIST. EXIST. 1-HR. RATED EXISTJlPRE-SCHOOL II <br /> MECH. RM, STAIRS \ 1(1018) II @) I[] <br /> (EO~5) @) II <br /> II I!? <br /> G G 110 II I <br /> II II -- --- <br />EXIST. <br />(}0,28) <br />G ====< <br /> i @TI) <br /> EXIST. EXIST. 1 -HR RATED G ~ 0 <br /> GYMICLASSROOM CORRIDOR EXIST. CORRIDOR 0 0 <br /> @D C@D @]) <br /> G EXIST. CORR, <br /> <1@) <br />EXIST. STOR, EXIST. CLASSROOM 0 <br />@) (}02{> <br />G G EXIST. PRE-SCHOOL <br /> @D <br />x 0 <br /> i JANITOR <br /> f <br /> /1 (}~09) <br /> .~- <br /> <br /> <br />N ~ <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />.. <br /> <br /> <br /> <br /> <br />EXIST. OPEN ST I <br />~S-O i)a <br /> <br />EXIST. CORR. <br />(EO~4) <br /> <br /> <br /> <br /> <br /> <br />o <br /> <br />o <br /> <br /> <br />EXISTING FIRE <br />AREA TO REMAIN <br />.. <br /> <br />EXP ANDED <br />FIRE AREA <br /> <br />1 EXISTING ARCHITECTURE TO REMAIN - PROVIDE NEW SPRINKLER SYSTEM <br />PER FIRE PROTECTION PLANS <br />2 RELOCATED EXISTING WINDOW. FIELD VERIFY DIMENSIONS <br />3 PROVIDE DOORS & WINDOWS AND PARTITION INFILL AT EXISTING WALL, SEE <br />INTERIOR ELEVATION E1/M,1 <br />4 PATCH & REPAIR EXISTING CONSTRUCTION AS NECESSARY <br />5 ALIGN NEW WALL WITH EXISTING <br />6 NEW CONC. FILLED STEEL PAN STAIR & STEEL HANDRAILS (BOTH SIDES), SEE <br />DETAIL A41A6.3 <br />7 NEW CONCRETE STOOP & FOUNDATIONS PER STRUCTURAL <br />8 PROVIDE SEMI-RECESSED FIRE EXTINGUISHER CABINET TO MATCH EXISTING <br />BUILDING STANDARD <br />9 APPROX. NEW HVAC DUCT LOCATIONS- CONTRACTOR TO COORDINATE WI <br />HVAC PLANS <br />10 LINE OF REMOVED WALL - NEW FINISHES WITHIN CORRIDOR EXPANSION TO <br />MATCH EXISTING <br />11 EXISTING WINDOW TO REMAIN <br />12 EXISTING 2-HR FIRE BARRIER TO REMAIN <br />13 EXISTING TO REMAIN <br />14 CONTRACTOR TO VERIFY SIZE OF PUMP ROOM WITH FIRE PROTECTION <br />CONTRACTOR <br />15 NEW PARTITIONS, DOORS, & FINISHESJO BE PROVIDED AS AIL TERNATE - SEE <br />SHEET A3.7 <br />16 NEW HVAC UNIT LOCATION - CONTRACiPR TO COORDINATE HVAC DRAWINGS <br />17 NEW 40"W X 74"H WALL OPENING - DOOR WORK IS PART OF ALTERNATE #1 _ <br />SEE SHEET A3.7 <br /> <br />o <br /> <br /> <br />KEYED NOTES - LOWER LEVEL PLAN <br /> <br /> <br /> <br />EXIST. ELEV. IJ <br />EQUIPMENT L:l <br />L. <br />(}003) /1' <br /> <br />EXIST. STOR. <br />(}006) <br /> <br /> <br />o <br /> <br />EXIST. MECHANICAL <br />EQUIPMENT <br />(}002) <br /> <br />o <br /> <br />EXIST. YOUTH ROOM <br />@) <br />o <br /> <br /> <br /> <br /> <br />LOWER LEVEL CONSTRUCTION PLAN <br /> <br />A3,2 A3.3 <br /> <br /> <br />1/8" = 1'-0" <br /> <br />. <br /> <br />. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />~ <br /> <br />9 <br /> <br />5; <br /> <br />j7 <br /> <br />!: <br /> <br />z; <br />