|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2010-00104
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2010
>
DCPZP-2010-00104
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2012 12:46:34 PM
Creation date
2/1/2012 4:09:01 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2010-00104
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br /> <br />'" <br />. <br />< <br />> <br />" <br />J <br />J <br />b <br />t <br /> <br />, <br />, <br />j ::E <br />" <( <br />t <br />- :;: <br />)<<.n <br />; 0 <br />o <br />~ <br />~ <br />) N <br />~ -0 <br />, " <br />~ C <br />(t <br />" <br />1ii <br />o <br /> <br />>> <br />.0 <br />C <br /><D <br /><5 <br />-, <br />C <br />o <br />, ro <br />'<( <br />>. <br /><ll <br />"0 <br /><D <br />C <br />'C <br />(L <br /> <br />GENERAL NOTES AND SPECIFICATIONS <br /> <br />1. All lumber, unless otherwise noted, shalt be S4S 62 $PF or better. <br /> <br />2. lumber embedded in, or in contact with, the ground sholl be treoted per <br />AWPA standards: <br />Embedded in Ground; 0.6 Ibs/le retention <br />Ground Contact: 0.4 lbs/ff retention <br /> <br />3. Steel panels and flashings sholl be 29 gouge, 80,000 PSI. pointed <br />golvanized. <br /> <br />4. All noils ore to be threaded, hardened steel unless otherwise noted. <br />fasteners used in treoted lumber sholl be hot dipped galvanized stainless <br />steel. or coted by the manufacturer for the application. <br /> <br />5. $oil shoH be graded to provide drainoge owoy from the building. Maintain <br />the grode levels shown on pions around the building_ <br /> <br />$. fill used for concrete floor slob sub grode, if present, sholl be reasonably <br />graded granular material. Flll used in columns holes shot! be the excavated <br />soil unless noted otherwise, All fill sholl be free from debris, stones over <br />4.~ ond frozen material. <br /> <br />7. Heating, ventilating, air conditioning, plumbing, and eledrical work is not 0 <br />port of this set of drawings and sholl be installed os per applicable codes. <br /> <br />BUILDING LOCATION <br /> <br />2891 ClY, HWY, AS <br />McFARlAND, WI 53558 <br />COUNTY: DANE <br /> <br />128 Lr. CONTINUOUS <br />PEAK VENTILATION <br /> <br />------------------------------------------------------------------------------------------------------------------------------------------------------------------------- <br /> <br /> <br />WEST ELEVATION <br /> <br />"' <br />, <br />'" <br /> <br /> <br /> <br />"' <br />, <br />'" <br /> <br />SOUTH ELEVATION <br /> <br />NORTH ElEVATION <br /> <br />(1) CLEARY WEAlHERVANE ""'- <br />OWNER lOCATE " <br /> <br /> <br />------------------- -- ----- --- - - ---- - ---- ---- ---- - ---- - - -- - - - - --- - <br /> <br /> <br />EAST ELEVATION <br /> <br />~ <.."., t <br />"i'-"'" <br /> <br />,~".:-~;',,::3. <br />Gz..ry~",'$ <br /> <br />i <br /> <br />~~,,~ ~~,+"- -~..~-~~~-- <br /> <br />TABLE OF CONTENTS <br /> <br />~~"~ <br /> <br />'7.1 <br /> <br />,,!;~p: <br /> <br />~~'"~-"~,;.,.~,,.~"_......-- <br /> <br />1. ELEVATIONS <br />2. FLOOR PLAN <br />3, TYPICAL SECTION "A" <br />4. TYPlCAL SECTION ~B" <br />5, ROOF STEEL ATTACHMENT DETAILS <br />6. TRUSS DIAGRAMS <br /> <br />- <br /> <br />DATE: <br />2/1/10 <br />DRAWN BY: <br />A. JORENBY <br />SCALE: <br />NONE <br />SAlES SPECIALIST: <br />ZEAL <br />VERONA <br /> REVISIONS: <br />NO. DATE BY <br />1 --- -- <br />2 --- -- <br />3 --- -- <br /> IX <br /><: w <br />\/) <br />~ ::?' <br />>- <br /><:) <br />J-.-.::: IX <br />W <br />~ :z <br />w <br /> (() <br /> I U) <br />:r::: " :z <br />- <br />x 0 <br />(.) 0 ~ <br />G::: N <br />- G:i <br />S2 x <br />0 -' <br />(0 W <br />~ <br />CI1ARY <br />BUILDING CORP. <br />WNW.clearybuildins,com <br /> 190 PAOU STRf8 <br /> P.O. BOX 930220 <br /> VERONA. WI 53593 <br /> (BOO) 373-5550 <br />JOB NO. <br />2010101749 <br /> SHEET <br /> 10F6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.