Laserfiche WebLink
Page2of2 <br /> ZONING PERMIT NO — -- -- <br /> DANE COUNTY ZONING PERMIT DCPZP.20,400 <br /> Conditions:1. THIS APPROVAL BY DANE COUNTY ZONING IS ONLY THE EXPRESS THE <br /> PLAN AS <br /> TEN <br /> PRESENTED. ANY MODIFICATION TO THE PROJECT REQUIRE <br /> APPROVAL BY DANE +OUNTY ZONING. THIS PERMIT SHALL B APPROVAL O VOID IF ANY DANE COUNTY <br /> MODIFICATIONS AR iy DE WITHOUT THE EXPRESS <br /> ZONING. INITIALS %L'' <br /> SURVEY REQUIREW A LOCATION SURVEY IS RQBE VERIFY COMPLIANCE <br /> A REGISTERED WITH <br /> ZONING ORDINANCE SETBACKS. THE SURVEY SHALL <br /> SURVEYOR, AND MUST BE RECEIVED BY DANE COUNTY ZONING WHEN THE <br /> FOUNDATION/BASEMENT WALLS ARE COMPLETED, OR IF THE PROJECT DOES NOT INCLUDE <br /> FOUNDATION/BASEMENT WALLS, AT THE TIME THE LOCATION OF THE STRUCTURE IS <br /> ESTABLISHED, AND BEFORE ANY OTHER WORK IS DO <br />