Laserfiche WebLink
DANE COUNTY ZONING PERMIT ZONING PERMIT NO. Page2of2 <br /> IDCPZP-2014-00901 <br /> Conditions:1. THIS APPROVAL BY DANE COUNTY ZONING IS ONLY FOR THE PLAN <br /> PRESENTED. ANY MODIFICATION TO THE PROJECT REQUIRES THE EXPRESS WRITTEN <br /> APPROVAL BY DAN COUNTY ZONING. THIS PERMIT SHALL BE NULL AND VOID IF ANY <br /> MODIFICATIONS A'■ k DE A -•UT THE EXPRESS WRITTEN APPROVAL OF DANE COUNTY <br /> ZONINGS , <br /> LOCATION OF THI` BUILDING IS CRITIAL. A LOCATION SURVEY IS REQUIRED AT THE TIME THE <br /> FOUNDATION IS INSTALLED. <br /> NO CHANGE OF GRADE WITHIN 5 FEET OF PROPERTY LINE PER TOPOGRAPHY ORDINANCE. <br /> LOCATION OF WELL TO BE SUBMITTED TO DANE COUNTY ZONING WHEN DETERMINED. <br />