|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2015-00011
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2015
>
DCPZP-2015-00011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2015 10:13:35 AM
Creation date
1/28/2015 3:44:39 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2015-00011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ARY <br /> 100' Mark Verification <br /> BUILDING CORP <br /> 41411581001111111111, AMINIEMBISWEIA, <br /> .4.... . <br /> ■ <br /> : N Job Number <br /> ■ <br /> , . <br /> AI B 100'Mark Elevation <br /> AI 7 <br /> 1 <br /> Grade Elevations <br /> C D i <br /> 1 . <br /> A/6 ' "/ 4: ' <br /> Bife) i/t '43' <br /> GUIDE: <br /> 4 /({ <br /> 1- Mark location of 100' mark above and the object 100' Mark is on <br /> 2- 100 Mark must be marked on a permanent object (i.e. stake, tree, fence post) rV' j <br /> 3- All elevations for slabs and walls must be listed above (if applicable) <br /> 4- Designate the ridgeline on the building above (North should match C100) <br /> 5- Locate utility lines within 20' from any edge of the building <br /> 6-The 100' Mark should be set to allow water to drain away from the building— see reverse side <br /> , <br /> Construction will not begin until the building perimeter is within 12"of grade. <br /> It is the responsibility of the purchaser to have the site ready prior to construction. <br /> * Purchaser signature verifies that the location of the 100' mark and the orientation of the building <br /> on the job site are accurate. Purchaser is aware that construction will not begin until building <br /> perimeter is within 12" of grade. <br /> * Purchaser signature acknowledges reviewing the building <br /> site perimeter for water drainage per the Warranty <br /> Conditions. See next page for more information. <br /> Branch Office <br /> 6 t 1 (4. P 71hele,,) 4?—• ' : 11 <br /> Purchaser Name(Please Print) * Purchas. S ature / Date <br /> _ <br /> / 4 , ‘, / ,,, •i <br /> / <br /> f / , <br /> Building Sales Specialist (Please Print) BuilditL: ales'Specialist Signature Date 4 <br /> This Form becomes part of the Cleary Building Corp. Contract <br /> AIGMISIESSISSM. <br /> Rev,5,14/10 ,... Form#C-030 <br />
The URL can be used to link to this page
Your browser does not support the video tag.