Laserfiche WebLink
DANE COUNTY ZONING PERMIT ZONING PERMIT NO. Page 2 of 2 <br /> DCPZP-2015-00044 <br /> Conditions:1. THIS APPROVAL BY DANE COUNTY ZONING IS ONLY FOR THE PLAN AS <br /> PRESENTED. ANY MODIFICATION TO THE PROJECT REQUIRES THE EXPRESS WRITTEN <br /> APPROVAL BY DANE COUNTY ZONING. THIS PERMIT SHALL BE NULL AND VOID IF ANY <br /> MODIFICATIONS ' ' - IAD ITHOUT THE EXPRESS WRITTEN APPROVAL OF DANE COUNTY <br /> ZONING. INITIAL �. <br /> SURVEY REQUIREM : A LOCATION SURVEY IS REQUIRED TO VERIFY COMPLIANCE WITH <br /> ZONING ORDINANCE SETBACKS. THE SURVEY SHALL BE PREPARED BY A REGISTERED LAND <br /> SURVEYOR, AND MUST BE RECEIVED BY DANE COUNTY ZONING WHEN THE <br /> FOUNDATION/BASEMENT WALLS ARE COMPLETED, OR IF THE PROJECT DOES NOT INCLUDE <br /> FOUNDATION/BASEMENT WALLS, AT THE TIME THE LOCATION OF THE STRUCTURE IS <br /> ESTABLISHED, AND BEFORE ANY OTHER WORK IS DONE. <br />