Laserfiche WebLink
A location survey, by a licensed surveyor, is required if your construction <br /> is within 10 feet of a setback line. <br /> • You will need to hire a surveyor to prepare a location survey to verify the construction location. <br /> • The survey shall be done at the time when foundations or basement walls are completed. <br /> • A location survey shall be submitted to the zoning office before continuing work on the project. <br /> • Note: A location survey may add significant cost to your project. Please contact a Wisconsin Licensed Land Surveyor. <br /> you may need this if . . . <br /> 33' 33' I I <br /> I <br /> Front Setback area S 72°57'40" E 254.01' F Side Setback area <br /> • Rear <br /> O y ' /������ Setback <br /> Y -�������������i////// area <br /> O O <br /> I- <br /> 1- <br /> Needs a 10 Feet / w , <br /> •• •• Location •+_ teback <br /> a ui <br /> QI w 1 0 --,...!..”1!!!!,...!..”1!!!! Survey D d 169.8' • ■F a0 <br /> Ocv Q Addition -J O <br /> Et a 35. � 2 i• o co <br /> O — - � iv N <br /> o <br /> co <br /> I z <br /> • r • <br /> 1 Side Setback area N 72° • <br /> 57'40" W <br /> 33' 33' I I <br /> 1. I,the undersigned, hereby make application for a zoning permit only for the location and the work described herein and <br /> certify to the accuracy of that information. I further certify I am the property owner,or a duly authorized representative, <br /> and may sign this permit application on behalf of the owner(s)of said property, and I have read and understand all of <br /> the conditions of this permit and will construct the project in compliance with those conditions. I understand that failure <br /> to provide accurate information or to comply with any provisions of the permit renders it null and void and may result in an <br /> enforcement action. <br /> 2. I,the undersigned, hereby consent to the entry on the permitted premises by zoning inspectors of the Dane County <br /> Department of Planning &Development to determine compliance with the county's zoning ordinances.This consent is <br /> valid for the period commencing with issuance of this zoning permit and terminating with issuance of a certificate of <br /> compliance or until earlier revoked in writing by the owner of the property. <br /> PRINT: Owner/Agent • DATE: <br /> SIGNATURE: Owner/Agent <br />