|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2015-00074
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2015
>
DCPZP-2015-00074
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2015 4:10:25 PM
Creation date
3/12/2015 10:30:41 AM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2015-00074
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r� Water Resource Engineering Division <br /> , .', Dane County Land&Water Resources Department <br /> pki cei— Jeremy Balousek,P.E.,Division Manager <br /> DATE: February 25, 2015 <br /> TO: Randy& Lynn Peters <br /> FROM: Jason Tuggle Jason rtea:.-gym <br /> Urban Erosion Control Analyst Tugglem„n�,�„a„ <br /> RE: Lot 57 Drumlin Creek—Shoreland Erosion Control Plan, SE2015-0030 <br /> (Associated Shoreland Mitigation Permit MG2015-0031) <br /> The submitted shoreland erosion control plan meets the needs of the site. The plan includes the <br /> following requirements: <br /> 1. The site will be accessed from Esker Trail using a stone tracking pad. The tracking pad <br /> must be a minimum of 50' long x 24' wide x 12” deep and be constructed of 3-inch clear <br /> stone. The access must be maintained in a manner that prevents material from reaching <br /> public roads. Any material tracked onto public roads must be removed immediately and <br /> the access controls must be improved prior to resuming construction traffic. <br /> 2. Silt fence must be installed prior to grading in the locations shown on the plan including <br /> down slope of all soil stockpiles. The silt fence must be maintained until the site is <br /> permanently stabilized. <br /> 3. Grading must be confined to the areas shown on the plan. Disturbed areas within 5' of the <br /> property line must be returned to pre-construction grades.No material storage, vehicle <br /> traffic or grading may occur outside the limits of disturbance on the plan. In the event any <br /> of these areas are disturbed, additional erosion control measures will be required. <br /> 4. The plan includes a construction schedule as follows: <br /> Excavation and grading is scheduled to begin on or around March 3, 2015. <br /> Disturbed areas must be temporarily covered with straw mulch within 30-days of <br /> initial disturbance. The mulch must be maintained to provide at least 70% <br /> coverage until disturbed areas are permanently restored. <br /> All disturbed areas must be permanently restored, as noted in the plan, by July 4, <br /> 2015. <br /> Construction must be done in accordance with the approved plan and schedule. This permit will <br /> expire on the stabilization date included in the plan (July 4,2015) and may be amended <br /> prior to permit expiration only. This review is for the shoreland erosion control requirements <br /> Lyman F.Anderson Agriculture&Conservation Center <br /> 5201 Fen Oak Drive,Room 208,Madison,Wisconsin 53718 -PH:608/224-3730,FAX:608/224-3745 <br /> www.countyofdane.comilwrd/pennit/ <br />
The URL can be used to link to this page
Your browser does not support the video tag.