|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2015-00061
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2015
>
DCPZP-2015-00061
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2015 4:11:18 PM
Creation date
3/12/2015 11:12:25 AM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2015-00061
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
335 N. Nine Mound Road, Verona, WI 53593-1035 <br /> 845-7187, Fax 845-7143 www.town.verona.wi.us <br /> own <br /> of DRIVEWAY Construction Permit Lot 2 CSM 2190 <br /> erona <br /> Town of Verona <br /> December 22. 2014 <br /> Applicant/Agent: Goff Construction <br /> Property Owner: Tom Goff <br /> Mailing Address for Completed Permits Name: Goff Construction <br /> Address: 2412 Amherst Rd <br /> Parcel # 062-0608-284-8240-4 Middleton, WI 53562 <br /> Town Road: Manhattan Dr Permitted Use: single family residential access and driveway <br /> Town Project Manager Determination: Date: 01-08-15 <br /> Prepared by: Ron Lease Phone: 338-3626 <br /> Determination: <br /> • Before driveway construction begins, contact the Town of Verona office at 845-7187. The Town office will <br /> contact Ron Lease—Project Manager to schedule a site visit to layout the entrance. <br /> • 15"diameter round culvert(no less than 20 ft. length)with endwalls. <br /> • Driveway access to be located approximately 300 ft. from State Rd 69 center line.The location will provide a <br /> 27 ft.radius point on the new driveway with 160ft to the centerline of Manhattan Dr heading North after the curve. <br /> • Tracking mat to be maintained during construction of driveway to eliminate debris on to Manhattan Dr. <br /> • Driveway should consist of 3"stone, 6 inches deep and 6 inches of base course to equal one ft. <br /> • Restoration of the road right of way access and driveway construction area shall include topsoil, seed,and mulch. <br /> • Driveway permit is effective for(12)months from the date of approval by the Town Board. If the driveway is <br /> not completed within that permit period,the permit is deemed expired and a new application must be submitted <br /> and approved. <br /> Verona Fire Department Date: 12/23/14 <br /> Prepared by: Matthew Miller <br /> Determination: Approved <br /> Tom Goff of Goff Construction has been approved for a single family residential driveway permit at Lot 2 — <br /> CSM 2190—Manhattan Dr—Parcel # 062-0608-284-8240-4 by the VERONA TOWN BOARD on <br /> February 3, 2015. <br /> ,4//5- <br /> Town Chair, or designee Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.