Laserfiche WebLink
DANE COUNTY ZONING PERMIT DAP N 201MITNO.0 Page2of2 <br /> Conditions:l. THIS APPROVAL BY DANE COUNTY ZONING IS ONLY FOR THE PLAN AS <br /> PRESENTED. ANY MODIFICATION TO THE PROJECT REQUIRES THE EXPRESS WRITTEN <br /> APPROVAL BY DANE COUNTY ZONING. THIS PERMIT SHALL BE NULL AND VOID IF ANY <br /> MODIFICATIONS ARE MADE WITHOUT THE EXPRESS WRITTEN APPROVAL OF DANE COUNTY <br /> ZONING. INITIALS <C_ <br /> EROSION CONTROL: OWNER/AGENT MUST CONTACT THE DANE COUNTY DEPARTMENT OF <br /> LAND &WATER RESOURCES (608-224-3647) TO HA?,IT RMINED IF AN EROSION <br /> CONTROL PERMIT IS REQUIRED. SIGNATURE DATE <br /> SURVEY REQUIREMENT: A LOCATION SURVEY IS REQUIRED TO VERIFY COMPLIANCE WITH <br /> ZONING ORDINANCE SETBACKS. THE SURVEY SHALL BE PREPARED BY A REGISTERED LAND <br /> SURVEYOR, AND MUST BE RECEIVED BY DANE COUNTY ZONING WHEN THE <br /> FOUNDATION/BASEMENT WALLS ARE COMPLETED, OR IF THE PROJECT DOES NOT INCLUDE <br /> FOUNDATION/BASEMENT WALLS, AT THE TIME THE LOCATION OF THE STRUCTURE IS <br /> ESTABLISHED, AND BEFORE ANY OTHER WORK IS DONE. <br /> yuA9 QuAl CSW■ --`fie, ?df ()pis - itM <br /> imottt6ptAtAiv( l a VLIA;c(t S wAtizss a c,nlar,u d cat) we oirt <br />