Laserfiche WebLink
A location survey, by a licensed surveyor, is required if your construction <br /> is within 10 feet of a setback line. <br /> • You will need to hire a surveyor to prepare a location survey to verify the construction location. <br /> • The survey shall be done at the time when foundations or basement walls are completed. <br /> • A location survey shall be submitted to the zoning office before continuing work on the project. <br /> • Note: A location survey may add significant cost to your project.Please contact a Wisconsin Licensed Land Surveyor. <br /> you may need this if . . . <br /> 33' 33' I I <br /> I I <br /> Front Setback area S 72°57'40" E 254.01' r Side Setback area <br /> • <br /> I j _ 1 Rear <br /> O , _ Setback <br /> pW7,,ZZ ' 1. / O <br /> 10 Feet F <br /> CO V Needs a "' <br /> Q Z <br /> W <br /> eeeeeeee Location Ø._Sethack <br /> w <br /> Q w 1 0 Survey p168.8'/ O Addition 35.V _ z is <br /> or_ _ _ _A <br /> O <br /> I 2 co <br /> 17,ff #.eJ J,141 <br /> _ _ <br /> co <br /> • r <br /> I Side Setback area <br /> N 72°57'40" VV <br /> 33' 33' I I <br /> I <br /> 1. I,the undersigned, hereby make application for a zoning permit only for the location and the work described herein and <br /> certify to the accuracy of that information. I further certify I am the property owner, or a duly authorized representative, <br /> and may sign this permit application on behalf of the owner(s)of said property, and I have read and understand all of <br /> the conditions of this permit and will construct the project in compliance with those conditions. I understand that failure <br /> to provide accurate information or to comply with any provisions of the permit renders it null and void and may result in an <br /> enforcement action. <br /> 2. I,the undersigned, hereby consent to the entry on the permitted premises by zoning inspectors of the Dane County <br /> Department of Planning&Development to determine compliance with the county's zoning ordinances.This consent is <br /> valid for the period commencing with issuance of this zoning permit and terminating with issuance of a certificate of <br /> compliance or until earlier revoked in writing by the owner of the property. <br /> PRINT: Owner/Agent DATE: <br /> (0--rt— TPie-2 ( tl(i "-71c- <br /> SIGNATURE: Owner/A <br /> iii/ <br /> ,,r <br />