|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2015-00178
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2015
>
DCPZP-2015-00178
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2015 12:22:42 PM
Creation date
4/28/2015 2:32:30 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2015-00178
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Sewer Connection Application <br /> Windsor Sanitary District#1 <br /> Application No. Date: ;! - <br /> hereby makes application for sewer service at the following location: <br /> (Owner) <br /> Address: • Lot: Block: <br /> Parcel No. Addition: <br /> Type of Building: Single Family Multi-unit dwelling Commercial Industrial <br /> Kind of Service: New Replacement Improvement <br /> Size of Connection: Type of Material <br /> Name and address of firm doing the proposed work: <br /> The customer is responsible for the cost of material and installation from the sewer main to the structure. If a road <br /> crossing is necessary,trenches in paved streets shall be refilled with compacted sand or gravel.There will be 6" <br /> deep concrete bridging placed over the excavation and 2" bituminous mixture(hot mix)placed over the concrete <br /> to match street grade. <br /> Remarks: <br /> In consideration of the granting of this permit the undersigned agrees: <br /> 1. To accept and abide by all provisions of the sewer use ordinances of the Madison Metropolitan <br /> Sewerage District and the Windsor Sanitary District#1 and all other pertinent ordinances or <br /> regulation that may be adopted in the future. <br /> 2. To maintain the building sewer at no expense to Windsor Sanitary District#1 <br /> 3. To notify the Town of Windsor Plumbing Inspector when the building sewer is completed and <br /> ready for inspection, but before any portion of the work is covered. <br /> 4. To install tracer wire and grounding rod in accordance with WSD# 1 ordinance. <br /> Remarks: <br /> Date: Signed <br /> (applicant) <br /> $ Hookup fees paid. <br /> (address of applicant) <br /> (5 er}ntendent, clerk, etc.) (phone) <br /> CONDITIONS: <br />
The URL can be used to link to this page
Your browser does not support the video tag.