Laserfiche WebLink
POTENTIAL CONDITIONS OF APPROVAL FOR CUFF 1 Z�30d <br /> The following conditions are based on those the ZLR commonly apply to permits for mineral extraction <br /> operations, customized to this particular site and operation, including conditions proposed by the applicant and <br /> reviewed and approved by the town. They are as follows: <br /> 1. The applicant shall submit an erosion control plan covering the entire CUP area for the duration of <br /> operations, and receive approval of an erosion control permit prior to commencing extraction operations. <br /> 2. The operator shall develop and operate the site according to the submitted site and operations plan. <br /> 3. Operations shall cease no later than ten (10) years from the date of issuance of the conditional use permit. <br /> 4. Reclamation shall be completed within one year after operations have ceased, and shall be phased <br /> according to the operations and reclamation plan. <br /> 5. Reclamation shall meet requirements of Chapter 74 of the Dane County Code of Ordinances (DCCO). <br /> 6. The operator shall post and maintain at all times a bond or irrevocable letter of credit in favor of Dane <br /> County, as required by Chapter 74 of the DCCO, to ensure compliance with the reclamation plan. <br /> 7. Access with be paved a minimum of 150 feet. <br /> 8. Hours of operations, except for crushing, screening, and washing shall be from 6 a.m. to 6 p.m., Monday <br /> through Friday, and from 8 a.m. to 3 p.m. on Saturday. Crushing, screening and washing shall not occur <br /> before 7 a.m. on Monday through Friday and 8 a.m. on Saturday. No operations of any kind shall take <br /> place on Sundays or legal holidays. Hours may be extended on a per need basis by approval of the Town <br /> Chair/Board, with written notification being given to Dane County Zoning. <br /> 9. Trucks shall exit the site onto Natvig Road where they can then access CTH N. <br /> 10. The existing right-of-way fence, located to the south and east of the property, shall be maintained. <br /> 11. The site shall be signed "no trespassing". When the extraction site is not open, the access road onto CTH <br /> N shall have gates securely locked. <br /> 12. There shall be no blasting or drilling on the site unless approved by the Township permitting process, and <br /> operator provides written evidence of town permit to Dane County Zoning. <br /> 13. There shall be no bulk fuel stored on the site. <br /> 14. There shall be no high capacity wells on site unless approved through appropriate WisDNR permitting <br /> process. <br /> 15. No mining shall take place within 300 feet of Little Door Creek. <br /> 16. Excavations below the grade of an abutting public street or highway shall be set back from the street or <br /> highway a distance at least equal to the distance that is required for buildings or structures under s. 10.17. <br /> (42 feet from Right of Way Line of CTH N and US HWY 12/18). <br /> 17. No mining or alteration of the natural grade shall take place within 5 feet of any property boundary. <br /> Compliance with the provisions of section 10.04(6) Topography Near Property Lines is required. <br /> 18. The operator shall require all trucks, excavation, crushing, screening and washing equipment to have <br /> muffler systems which meet or exceed then current industry standards for noise abatement. <br /> 19. The applicant shall meet DNR standards for particulate emissions as described in NR 415.075, Wisconsin <br /> Administrative Code. <br /> 20. The zoning administrator or designee may enter the premises of the operation to inspect those premises <br /> and to ascertain compliance with these conditions or to investigate an alleged violation. If the operation is <br /> not in reasonable compliance with the terms of this approval, such approval is subject to amendment or <br /> revocation. <br />