Laserfiche WebLink
A location survey, by a licensed surveyor, is required if your construction <br /> is within 10 feet of a setback line. <br /> • You will need to hire a surveyor to prepare a location survey to verify the construction location. <br /> • The survey shall be done at the time when foundations or basement walls are completed. <br /> • A location survey shall be submitted to the zoning office before continuing work on the project. <br /> • Note: A location survey may add significant cost to your project.Please contact a Wisconsin Licensed Land Surveyor. <br /> you may need this if . . . <br /> 33' 33' <br /> I I <br /> Front Setback area S 72°57'40" E 254.01' r Side Setback area <br /> I jjJ/ Rear <br /> r/// ;71��//7.#. // //� 1 Setback <br /> `/ area <br /> O ! O <br /> �V 10 Feet Z <br /> CO <br /> 0 i- <br /> Needs a< W co <br /> Location 2 <br /> W <br /> Q w I Iii Survey Setback W <br /> O �� Proposed��1�k^■� 169.8' Line <br /> _/ N Q Addition J O <br /> CC io 35. ��j io <br /> O -�SY %�� N <br /> o <br /> �� CO <br /> r <br /> _ _ <br /> • I' • <br /> I Side Setback area <br /> N 72°57'40" W <br /> 33' 33' I <br /> 1. I,the undersigned,hereby make application for a zoning permit only for the location and the work described herein and <br /> certify to the accuracy of that information. I further certify I am the property owner,or a duly authorized representative, <br /> and may sign this permit application on behalf of the owner(s)of said property,and I have read and understand all of <br /> the conditions of this permit and will construct the project in compliance with those conditions. I understand that failure <br /> to provide accurate information or to comply with any provisions of the permit renders it null and void and may result in an <br /> enforcement action. <br /> 2. I,the undersigned,hereby consent to the entry on the permitted premises by zoning inspectors of the Dane County <br /> Department of Planning&Development to determine compliance with the county's zoning ordinances.This consent is <br /> valid for the period commencing with issuance of this zoning permit and terminating with issuance of a certificate of <br /> compliance or until earlier revoked in writing by the owner of the property. <br /> PRINT: Owner/Agent DATE: <br /> Benjamin C. Staats 05/02/2015 <br /> SIGNATURE: Owner/Agent <br /> rnif22- -- • <br />