|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2015-00203
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2015
>
DCPZP-2015-00203
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2015 1:28:09 PM
Creation date
5/6/2015 10:55:17 AM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2015-00203
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
csel t„, Water Resource Engineering Division <br /> '', Dane County Land&Water Resources Department aff <br /> ?�q = Jeremy Balousek,P.E.,Division Manager <br /> COS <br /> DATE: April 23, 2015 <br /> TO: Scott&Angela Heiman <br /> Jason <br /> FROM: Jason Tuggle °. <br /> Urban Erosion Control Analyst Tuggle �.1 <br /> RE: Heiman Residence—Shoreland Erosion Control Plan,SE2015-0100 <br /> The submitted shoreland erosion control plan meets the needs of the site. The plan includes the <br /> following requirements: <br /> 1. The site will be accessed from County Highway TT using a stone tracking pad. The <br /> tracking pad must be a minimum of 50' long x 24' wide x 12"deep and be constructed of <br /> 3-inch clear stone. The access must be maintained in a manner that prevents material <br /> from reaching public roads. Any material tracked onto public roads must be removed <br /> immediately and the access controls must be improved prior to resuming construction <br /> traffic. <br /> 2. Silt fence must be installed prior to grading in the locations shown on the plan including <br /> down slope of all soil stockpiles. The silt fence must be maintained until the site is <br /> permanently restored. <br /> 3. Disturbed areas must be temporarily mulched with straw or woodchips within 1-month of <br /> initial disturbance. The mulch cover must be maintained until disturbed areas are <br /> permanently restored. <br /> 4. Grading must be confined to the areas shown on the plan.No material storage, vehicle <br /> traffic or grading may occur outside the limits of disturbance on the plan. In the event any <br /> of these areas are disturbed, additional erosion control measures will be required. <br /> 5. The plan includes a construction schedule as follows: <br /> Excavation and grading is scheduled to begin upon receipt of all required permits. <br /> Disturbed areas associated with the driveway must be permanently restored by <br /> June 4, 2015. <br /> All disturbed areas must be permanently restored, as noted in the plan, by May 1, <br /> 2016. <br /> Lyman F.Anderson Agriculture&Conservation Center <br /> 5201 Fen Oak Drive,Room 208,Madison,Wisconsin 53718 -PH:608/224-3730,FAX:608/224-3745 <br /> www.countyofdane.com/lwrd/permit/ <br />
The URL can be used to link to this page
Your browser does not support the video tag.