|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2015-00228
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2015
>
DCPZP-2015-00228
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2015 1:13:23 PM
Creation date
5/6/2015 11:11:37 AM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2015-00228
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 2 of 4 <br /> building with a floor area of no more than 314 square feet <br /> per user sharing the building. Buildings constructed or <br /> used by tower collocators shall be subject to all conditions <br /> established for Conditional Use Permit No. 2032, including <br /> locational requirements contained in the site plan. <br /> 5) The holder of Conditional Use Permit No. 2032 shall, through <br /> ownership, lease, option or other means, at all times have <br /> the right to use the land associated with the permitted <br /> tower for uses related to the use of the collocation sites <br /> required hereunder, including the construction and use of <br /> buildings as permitted under paragraph 5 herein. <br /> 6) The final site plan (s) and design drawings included in the <br /> petition application are fully incorporated herein and <br /> continued effectiveness of Conditional Use Permit No. 2032 <br /> is expressly conditioned upon compliance with those plans. <br /> 7) Upon written inquiry by the committee the holder of <br /> Conditional Use Permit No. 2032 shall have the burden of <br /> presenting to the committee credible evidence establishing <br /> to a reasonable certainty the continued compliance with all <br /> conditions placed upon the conditional use permit. Failure <br /> to establish compliance with all conditions placed upon the <br /> conditional use permit shall be grounds for revocation of <br /> the permit. In the event the committee determines that it - <br /> is necessary to consult with a third party to ascertain <br /> compliance with conditions on Conditional Use Permit No. <br /> 2032, all reasonable costs and expenses associated with such <br /> consultation shall be borne by the holder of said <br /> conditional use permit. Failure to pay such costs and <br /> expenses or provide information requested by the committee <br /> shall be grounds for revocation of the conditional use <br /> permit. <br /> 8) The holder of Conditional Use Permit No. 2032 shall within <br /> 30 days of any collocation on the permitted tower provide <br /> the committee with written notification of the identity of <br /> the collocator and the nature of the equipment installed. <br /> Within 30 days of the date on which any collocated use <br /> ceases, the permit holder shall provide the committee with <br /> written notice of the cessation of such use . Any changes <br /> due to collocation or otherwise shall be reviewed by the <br /> Zoning Administrator prior to implementation to determine if <br /> permits are needed and to determine that such changes are in <br /> compliance with terms of the CUP and does not significantly <br /> alter the appearance or structural integrity of the tower <br /> approved and permitted under this CUP. <br />
The URL can be used to link to this page
Your browser does not support the video tag.