Laserfiche WebLink
• <br /> (e) Describe any material discrepancy between the location of the corner as restored or reestablished and <br /> the location of that corner as previously restored or reestablished by distance and direction. Show the <br /> discrepancy in the sketch on sheet 1. <br /> None. <br /> (f)Was the corner restored through acceptance of(1)an obliterated evidence location, or (2) a found <br /> perpetuated location? <br /> Found perpertuated location. <br /> (g&h)Was the corner reestablished through proportionate methods? If so, show the method, including the <br /> directions and distances to other public land survey corners used as evidence or used for proportioning in <br /> determining the corner location? <br /> No. <br /> (i) List all previous Monument Records found, previously filed for the subject corner, including monument <br /> types set or found, surveyor, and date of survey. <br /> January 20, 2005: Jeffrey B. Johnson found an existing chiseled cross in pavement. Checked the <br /> location with existing ties based on Dossier sheet of Alden Kauki, placed new witness monuments <br /> prior to reconstruction of USH 51 and reset a concrete monument with alumnium cap and cast iron <br /> cover during construction. <br /> March 24, 2009: Jamey L. Reid found an aluminum monument as previously tied by Jeffrey B. Johnson <br /> and all reference monuments are still intact. <br /> to I, Kristin J. Belongia, RLS Affix Land Surveyor Seal <br /> hereby certify that the corner location shown on <br /> this record was determined by me or under my ,.��''� <br /> direction and correct and that this U.S. Public ;.•� S�aNg� <br /> Land Survey Monument Record is correct ;fit/ <br /> complete to the best of my knowledge and belief. _ /KRISTIN J.BELONGIA <br /> S-2943 <br /> ELKHORN, <br /> WI <br /> • <br /> ''.. ....... • p ``` <br /> , 0 SURdE .` <br /> •: • 10/22/2013 <br /> • <br /> Signature Date <br />