Laserfiche WebLink
MATTHEW B LAWINGER Page 3 411t2015 <br /> Note: Effective May 7,2012,Effective immediately,the Division of Industry Services Commercial Building <br /> Program will no longer require the submittal of either emergency egress lighting plans or lighting energy <br /> conservation plans to our agency. Instead following are revised expectations: <br /> • Emergency Egress Lighting-Building designers shall provide at the project site an egress plan showing <br /> where exit lights and emergency egress lighting will be required for new buildings,additions and alterations <br /> that create new egress paths. Effective July 1,2012,this egress plan shall be included with the building <br /> plan submittal to our agency. In addition to the egress plan at the jobsite,there shall be emergency <br /> lighting cut-sheets,calculations or other means to show compliance of the installed fixtures. Local <br /> inspectors may request additional information. <br /> • Energy Conservation—Building designers,electrical designers or electrical contractors shall provide fixture <br /> layouts,fixture cut-sheet,energy calculations or other documentation at the project site. <br />