|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2015-00402
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2015
>
DCPZP-2015-00402
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2015 2:22:52 PM
Creation date
7/17/2015 11:33:13 AM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2015-00402
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4 <br /> x DA NE COUNTY EROSION 1 CONTROL A <br /> ND <br /> n O 'itiiiii4ATER.mAN4044ENT, <br /> Permit Fees <br /> Permit Fee <br /> Erosion Control Permit 2 <br /> Issued Under s.14.45 $200 base fee+$0.005/ft of disturbed area <br /> Erosion Control Permit[simplified application] $100 base fee <br /> Issued Under s.14.45 meeting criteria in s.14.50(2) <br /> Shoreland Erosion Control Permit $400 base fee+$0.005/ft2 of disturbed area <br /> Issued Under s. 11.05(3) <br /> Shoreland Erosion Control Permit[P.E.waiver] $200 base fee+$0.005/ft2 of disturbed area <br /> Issued Under s. 11.05(3)meeting criteria in s. 11.05(2)(c) <br /> Shoreland Erosion Control Permit[simplified application] <br /> Issued Under s. 11.05(3)meeting criteria in s. 11.05(2)(b)or(d) $100 base fee <br /> • $400 base fee+$500 restored vegetative buffer+$0.010/ft2 of <br /> Shoreland Mitigation Permit new impervious+$0.005/ft2 of redeveloped impervious OR <br /> $100 flat fee for projects meeting criteria of s. 11.50(6)(a) <br /> Stormwater Management Permit $400 base fee+$0.010/ft2 of new impervious+$0.005/ft2 of <br /> Issued Under s. 14.46 redeveloped impervious <br /> Permit Review Process <br /> If your site is in the Shoreland Zone, please contact Dane County Zoning first at(608) 266-4266. <br /> When requesting a permit,two copies of all required submittals must be provided in person at the Dane <br /> County Water Resource Engineering Office. <br /> Upon verifying the application is complete,the plan is queued for review. <br /> Water Resource Engineering staff will inform you or your consultant of permit approval or plan deficiencies <br /> within 15 working days. <br /> Upon approval of the plan and confirmation that all requirements are met,a permit will be issued. <br /> You may pick up the permit card at the Water Resource Engineering Office, or request that it be sent to you by <br /> email. <br /> Other Information <br /> The permit card must be posted and a copy of the approved plan must be <br /> kept on site for the duration of permit coverage. <br /> Dane County may issue STOP WORK ORDERS and CITATIONS on sites <br /> without valid permits. <br /> For more information about Erosion Control and <br /> Stormwater Management Permits, contact: <br /> Dane County Water Resource Engineering Division <br /> 5201 Fen Oak Drive, Room 208 <br /> Madison, WI 53718, (608) 224-3730 <br /> www.lwrd.countyofdane.com/wred <br />
The URL can be used to link to this page
Your browser does not support the video tag.