Laserfiche WebLink
ZONING PERMIT NO. Page 2 of Z <br /> DANE COUNTY ZONING PERMIT <br /> DCNING PE 1 IT NO. 1 <br /> Conditions:l. THIS APPROVAL BY DANE COUNTY ZONING IS ONLY FOR THE PLAN AS <br /> PRESENTED. ANY MODIFICATION TO THE PROJECT REQUIRES THE EXPRESS WRITTEN <br /> APPROVAL BY DANE • ► Y ZON '4G. THIS PERMIT SHALL BE NULL AND VOID IF ANY <br /> MODIFICATIONS •UT THE EXPRESS WRITTEN APPROVAL OF DANE COUNTY <br /> ZONING. INITIAL ni. <br /> SURVEY ADVISO1'OTE: A LOCATION SURVEY MAY BE REQUIRED TO VERIFY THAT THE <br /> BUILDING IS CONSTRUCTED ACCORDING TO THE PLAN SUBMITTED WITH THIS APPLICATION. <br /> yi � <br />