Laserfiche WebLink
DANE OUNTY ZONING PERMIT ZONING PERMIT NO Page2of2 <br /> DCPZP-2015-00166 <br /> Conditions 1, THIS APPROVAL BY DANE COUNTY ZONING IS ONLY FOR THE PLAN AS <br /> PRESENT , ANY MODIFICATION TO THE PROJECT REQUIRES THE EXPRESS WRITTEN <br /> APPROVA BY DANE COUNTY ZONING. THIS PERMIT SHALL BE NULL AND VOID IF ANY <br /> MODIFICA IONS ARE MADE WITHOUT THE EXPRESS WRITTEN APPROVAL OF DANE COUNTY <br /> ZONING. I ITIALS <br /> SURVEY R QUIREMENT: A LOCATION SURVEY IS REQUIRED TO VERIFY COMPLIANCE WITH <br /> ZONING 0 DINANCE SETBACKS. THE SURVEY SHALL BE PREPARED BY A REGISTERED LAND <br /> SURVEYO , AND MUST BE RECEIVED BY DANE COUNTY ZONING WHEN THE <br /> FOUNDATI N/BASEMENT WALLS ARE COMPLETED, OR IF THE PROJECT DOES NOT INCLUDE <br /> FOUNDATI N/BASEMENT WALLS, AT THE TIME THE LOCATION OF THE STRUCTURE IS <br /> ESTABLIS ED, AND BEFORE ANY OTHER WORK IS DONE. <br />