|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2015-00572
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2015
>
DCPZP-2015-00572
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2015 1:43:06 PM
Creation date
8/4/2015 1:42:57 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2015-00572
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ti Of <br /> i1 I Tl#��- Dane County Planning & Development <br /> §„ ,!% Zoning Division <br /> ZONING PERMIT INSPECTION REQUIREMENTS <br /> The Dane County Zoning Ordinance provides that two inspections shall be made by the Zoning Division. <br /> Instructions are as follows: <br /> 1. The permit card shall be posted on the premises before any earth disturbing activity is started. <br /> 'The o. •_ .•--. all have all lot corners visibly staked prior to requesting an inspection.The Zoning <br /> I :-c or shall not be re ible for determining the location of lot lines. Please be advised that zoning <br /> inspections are made in relia e upon your correct identification of property boundaries and lot lines. <br /> 3. FIRST INSPECTION: <br /> - • - '•• - -y required? No <br /> If yes, a first inspection phone call request is not required. Please arrange to have a copy of the survey <br /> delivered to our department prior to any construction above the foundation. <br /> b. If no,the owner or agent shall request the first inspection when the foundation or basement walls have <br /> been constructed. Footings only are not considered a foundation. The locational extent of the permitted structure <br /> must •- '•-• - a i e e of the first inspection. Construction may continue only after an inspection has been <br /> re• - ed. <br /> 4. SECOND INSPECTION: Shall be -quested when the building is substantially completed. Interior trim, <br /> carpeting, painting,etc.,do not have to •- finished prior to the inspection but, interior walls must be in place and <br /> •- - - ' - • •1•'•• -•• •--. '•• - ces must be installed and operating. <br /> 5. CERTIFICATE OF COMPLIANCE: The zoning inspections are made to verify compliance with the regulations <br /> of the zoning ordinance. The Zo '•- •• •usi• = '•n of both inspections will issue a certificate of <br /> compliance. <br /> To schedule a pection, call 266-4266, Monday through Friday, 8: 0 AM-4:00 PM.You will be given an <br /> inspectio -quest number, which will serve as a verification of your ca . <br /> Permit Number DCPZP-2015-00572 <br /> IMPORTANT: The two inspections required by the Zoning Ordinance can only be made by the Zoning Department. <br /> **TOWN PERMITS: For information regarding Town permits,contact TOWN OF RUTLAND <br /> the <br /> Town <br /> S ee K ; cf-4-c 15Cr■ o — y y 5 — <br /> at <br /> Building Inspector/Clerk Phone Number <br /> 210 Martin Luther King Jr.Blvd.0 City-County Bldg,Room 1160 Madison,WI 53703-33420 Phone:608.266.42660 Fax:608.267.1540 <br />
The URL can be used to link to this page
Your browser does not support the video tag.