|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2015-00549
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2015
>
DCPZP-2015-00549
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2015 11:33:37 AM
Creation date
8/4/2015 3:38:01 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2015-00549
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Erosion Control For Office Use 0* <br /> Application Checklist Permit Number: <br /> Associated Permits: <br /> Project Name:Premier Co-op 2015 Grain Bin <br /> Erosion Control Plan Requirements Plan Materials X Location of Information: <br /> Page Number or Attachment <br /> 1. Narrative describing the proposed project / Cover letter <br /> 2. Site plan(of known scale that includes:property lines,disturbed area limits,impervious area v Exhibit #1 <br /> limits(existing and proposed),natural and artificial water features, 100-yr flood plain,delineated <br /> wetland boundaries,location of all proposed erosion control practices) <br /> NOTE:Grading within 5'of the property line requires fepartment approval <br /> 3. Contours(existing and proposed) ✓ Exhibit #1 <br /> 4. Watershed size for each drainage area(include area draining to the site and within ✓ Exhibit #3 <br /> project boundaries) <br /> 5. Culvert sizes(existing and proposed) ✓ Exhibit #1 <br /> 6. Cross sections and profiles of ditches,channels,swales and structural ✓ Exhibit #1 & #3 <br /> measures(existing and proposed) <br /> 7. Design calculations for ditches,channels,swales and structural measures ✓ Exhibit #3 & #4 <br /> (velocity&capacity calculations) <br /> 8. Direction of runoff flow from impervious surfaces(roof downspouts,driveways,etc.) Exhibit #1 <br /> 9. Universal Soil Loss Equation(USLE)worksheet(s)(for each element of the erosion Exhibit #2 <br /> control plan.Dates must correspond to construction schedule and be appropriate for each 1 <br /> erosion control practice) <br /> 10. Tracking control(provisions to prevent mud-tracking onto public streets and roads during v( Exhibit #1 <br /> construction,e.g.tracking pad or existing gravel drive) <br /> 11. Sediment control practices to protect stormwater facilities or storm sewer Exhibit #1 <br /> inlets,existing and proposed,on or adjacent to the site(e.g.inlet protection or 1 <br /> stone weeper) <br /> 12. Site stabilization details&methods(type&rate of;fertilizer,seed,mulch,sod,etc.) Exhibit #1 <br /> 13. Any other necessary information pertaining to the physical or environmental ✓ Cover Letter <br /> features of the site <br /> Erosion Control Plan Requirements-Performance Standards X Location of Information: <br /> Page Number or Attachment <br /> 14. Prevent gully and bank erosion 1 Exhibit #1 & #4 <br /> 15. Practices must reduce erosion to minimum sheet and rill erosion standards: ✓ Exhibit #2 <br /> (7.5 tons/acres/year) <br /> 16. Proof of stable outlet capable of carrying site runoff at a non-erosive velocity ✓ Cover letter <br /> (outlet design must account for flow capacity and duration) <br /> Permit Application Requirements X Location of Information: <br /> Page Number or Attachment <br /> 17. Timetable and construction schedule ✓ Exhibit #1 <br /> 18. Preliminary review letter Not Applicable <br /> 19. Copies of permits or approval from other agencies(WDNR,US Army Corps of Not Applicable <br /> Engineers,County Zoning,Town,etc.) <br /> 20. Itemized estimated cost of erosion control plan implementation(including ✓ Exhibit #5 <br /> installation and labor) <br /> 21. Financial responsibility(financial security instrument required if cost estimate exceeds Cost Estimate less than <br /> $5000) $5,000 <br /> Revised 01.08.2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.