|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-2015-02311
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
2010s
>
2015
>
DCPCUP-2015-02311
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2015 3:01:47 PM
Creation date
8/13/2015 3:01:29 PM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
02311
Town
Springdale Township
Section Numbers
23
AccelaLink
DCPCUP-2015-02311
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Proposed Conditions for CUP 2311 <br /> 1. The applicant shall submit an erosion control plan covering the entire CUP area for the duration of <br /> operations, and receive approval of an erosion control permit prior to commencing further extraction <br /> operations. <br /> 2. There shall be an additional element of this particular erosion control plan to be called a"dewatering <br /> plan"that will outline how water will be: stored and treated on-site (e.g. via an on-site catchment <br /> basin that would filter out large particulate matter from the water prior to pumping it off-site); <br /> removed from the site; and drained into and across the Ringgenberg field to the south. The applicant <br /> will need to demonstrate how any water to be pumped or otherwise removed from the site will be of a <br /> quality that meets with the Dane County Land Conservation Department's approval. <br /> 3. On the site plan (dated 12/14/98), there is a discharge pipe indicated in the south of the site that directs <br /> water, via a culvert under the lateral road running between Erb Road and Ringgenberg Drive, into <br /> Ringgenberg's field to the south. The prevailing surface water drainage course directs this water flow <br /> toward an intermittent stream course further to the south. This water discharge location shall be the <br /> only location from which water will be pumped or otherwise removed from the site. <br /> 4. The applicant shall apply for and receive all other required local, state and federal permits. In <br /> particular, the applicant shall contact Tom Harpt of the Wisconsin Department of Natural Resources <br /> (DNR) South-Central Region Office in Fitchburg at(608) 275-3285 and acquire the appropriate <br /> permit to discharge water from a non-metallic mining operation under the Wisconsin Pollutant <br /> Discharge Elimination System(WPDES). <br /> 5. The operator shall develop and operate the site according to the submitted site/operations plan, dated <br /> 12/14/98. <br /> 6. Operators shall cease no later than 15 years from the date of CUP approval, with a site inspection by <br /> Dane County Zoning in 7.5 years. <br /> 7. Reclamation shall be completed within one year after operations have ceased, and shall follow the <br /> operator's submitted reclamation plan. As each phase is completed,the restoration of that phase must <br /> be completed as much as possible before extracting in the next phase. Final reclamation of the 5.4 acre <br /> CUP area must be up to NR 135 standards and pertinent ordinances/regulations governing <br /> reclamation. A copy of the required reclamation plan shall be filed with both the Town of Springdale <br /> and Dane County Zoning. <br /> 8. To ensure compliance with the reclamation plan, the operator shall post and maintain a bond or <br /> irrevocable letter of credit in favor of Dane County in the amount of$8,100 ($1,500 per acre of <br /> subject site) until reclamation is satisfactorily completed. <br /> 9. The driveway accessing the subject site shall be paved. The operator shall maintain the driveway in a <br /> dust free manner in accordance with local, state and federal regulations, and shall clean any dust or <br /> mud tracked onto public roads. <br /> 10. The operator and all haulers shall access the CUP site only through the existing access point onto the <br /> nameless road south of the site running perpendicularly between Erb Road and Ringgenberg Drive, <br /> locally known as Ringgenberg Drive. <br /> 11. The access to the driveway shall have gates securely locked when the extraction site is not in <br /> operation. The site shall be signed"no trespassing." <br /> 12. Hours of operation shall be from 6 a.m. to 6 p.m., Monday through Friday. Saturday and Sunday <br /> operations are prohibited except for general maintenance and occasional trucking of material out of <br /> the quarry on Saturdays only.No operations of any kind shall take place on Sundays or legal holidays. <br /> 13. The operator shall comply with Subchapter VII—Blasting Resultants of the State of Wisconsin <br /> Department of Commerce Administrative Code and pertinent ordinances/regulations governing <br /> blasting. <br />
The URL can be used to link to this page
Your browser does not support the video tag.