|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-2015-02311
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
2010s
>
2015
>
DCPCUP-2015-02311
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2015 3:01:47 PM
Creation date
8/13/2015 3:01:29 PM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
02311
Town
Springdale Township
Section Numbers
23
AccelaLink
DCPCUP-2015-02311
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
12. Hours of operation shall be from 6 a.m. to 6 p.m.,Monday through Friday. Saturday and <br /> Sunday operations are prohibited except for general maintenance and occasional trucking <br /> of material out of the quarry on Saturdays only.No operations of any kind shall take <br /> place on Sundays or legal holidays. <br /> 13. The operator shall comply with Subchapter VII—Blasting Resultants of the State of <br /> Wisconsin Department of Commerce Administrative Code and pertinent <br /> ordinances/regulations governing blasting. <br /> 14. In particular, blasting levels shall be kept below 0.5 inch/second peak particle velocity at <br /> frequencies below 40 Hz., as per the State of Wisconsin Department of Commerce <br /> Administrative Code, s. 7.64, Table 7.74-2. <br /> 15. The operator shall keep on file a seismographic record for every blast: This record shall <br /> be provided upon request(this is already the operator's practice). <br /> 16. There shall be a safety fence around the entire extraction area at all times. The safety <br /> fence shall be a minimum of 5 feet in height with a single strand of barbed wire on the <br /> top. <br /> 17. The operator shall use spray bars (water) in the crushing process to reduce dust. Use of <br /> spray bars is not required when the temperature is below freezing. The operator shall <br /> spray the site with water if and when needed to control dust. <br /> 18. There shall be no bulk fuel stored on site. (In cases where the operator wishes to have <br /> bulk fuel stored on site,the operator should indicate why and provide a plan for spill <br /> containment that meets state regulations.) <br /> 19. All excavation equipment,plants and vehicles shall be fueled, stored, serviced and <br /> repaired on lands three (3)feet above highest water table elevation to prevent against <br /> groundwater contamination from leaks or spills. <br /> 20. The operator shall require all trucks and excavation equipment to have muffler systems <br /> that meet or exceed current industry standards for noise abatement. <br /> 21. The operator shall meet DNR standards for particulate emissions as described in NR <br /> 415.075 and NR 415.076 and pertinent ordinances/regulations governing particulate <br /> emissions. <br /> 22. Dane County and the Town of Springdale shall be listed as additional named insureds on <br /> the operator's liability insurance policy,which shall be for a minimum of$1,000,000 <br /> combined single limit coverage per occurrence. The operator shall furnish a copy of a <br /> Certificate of Insurance as evidence of coverage before operations commence. The <br /> liability insurance policy shall remain in effect until reclamation is complete. Copies of <br /> appropriate insurance policies shall be filed with the Town of Springdale. <br /> 23. The zoning administrator or designee may enter the premises of the operation to inspect <br /> those premises and to ascertain compliance with these conditions or to investigate an <br /> alleged violation. If the operation is not in reasonable compliance with the terms of this <br /> approval, such approval is subject to amendment or revocation. <br /> THE ZONING AND LAND REGULATION COMMITTEE AFTER PUBLIC HEARING <br /> AND IN THEIR CONSIDERATION OF THE CONDITIONAL USE PERMIT MADE THE <br /> FOLLOWING FINDINGS OF FACT: <br /> 1. That the establishment, maintenance and operation of the proposed conditional use will not be <br /> detrimental to or endanger the public health, safety, morals comfort or general welfare. <br /> H:\Zoning\ZLR\Conditional Use Permits\CUP 2300's\CUP #2311.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.