|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-2015-02311
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
2010s
>
2015
>
DCPCUP-2015-02311
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2015 3:01:47 PM
Creation date
8/13/2015 3:01:29 PM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
02311
Town
Springdale Township
Section Numbers
23
AccelaLink
DCPCUP-2015-02311
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 2 <br /> 2. There shall be an additional element of this particular erosion control plan to be called a <br /> "dewatering plan" that will outline how water will be: stored and treated on-site (e.g. via an on- <br /> site catchment basin that would filter out large particulate matter from the water prior to pumping <br /> it off-site); removed from the site; and drained into and across the Ringgenberg field to the south. <br /> The applicant will need to demonstrate how any water to be pumped or otherwise removed from <br /> the site will be of a quality that meets with the Dane County Land Conservation Department's <br /> approval. <br /> 3..On the site plan(dated 12/14/98), there is a discharge pipe indicated in the south of the site that <br /> irects water, via a culvert under the lateral road running between Erb Road and Ringgenberg <br /> Road, into Ringgenberg's field to the south. The prevailing surface water drainage course directs <br /> S fi this water flow toward an intermittent stream course further to the south. This water discharge <br /> ko; location shall be the only location from which water will be pumped or otherwise removed from <br /> the site. <br /> 4. The applicant shall apply for and receive all other required local, state and federal permits. In <br /> particular, the applicant shall contact Tom Harpt of the Wisconsin Department of Natural <br /> Resources (DNR) South-Central Region Office in Fitchburg at (608) 275-3285 and acquire the <br /> appropriate permit to discharge water from a non-metallic mining operation under the Wisconsin <br /> Pollutant Discharge Elimination System(WPDES). <br /> 5. The operator shall develop and operate the site according to the submitted site/operations plan, <br /> dated 12/14/98. <br /> 6:Operations shall cease no later than 15 years from the date of CUP approval, with a site <br /> inspection by Dane County Zoning in 7.5 years. <br /> 7. Reclamation shall be completed within one year after operations have ceased, and shall follow <br /> the operator's submitted reclamation plan. As each phase is completed, the restoration of that <br /> phase must be completed as much as possible before extracting in the next phase. Final <br /> reclamation of the 5.4 acre CUP area must be up to NR 135 standards;NR 135 is currently <br /> pending approval at the state level. A copy of the required reclamation plan shall be filed with <br /> both the town of Springdale and Dane County Zoning. <br /> 8. State approval of NR 135 is anticipated in Fall of 1999. Following state approval, counties will <br /> be required to update their ordinances accordingly. The applicant (Wingra Stone Company) has <br /> indicated in their Application for Conditional Use Permit statement that all reclamation will be in <br /> accordance with NR-135. <br /> 9. To ensure compliance with the reclamation plan, the operator shall post and maintain a bond or <br /> irrevocable letter of credit in favor of Dane County in the amount of $8,100 ($1,500 per acre of <br /> subject site)until reclamation is satisfactorily completed. <br /> 10. The driveway accessing the subject site shall be paved. The operator shall maintain the <br /> driveway in a dust free manner in accordance with local, state, and federal regulations, and shall <br /> clean any dust or mud tracked onto public roads. <br /> ).1-:The operator and all haulers shall access the CUP site only through the existing access point <br /> onto the nameless road south of the site running perpendicularly between Erb Road and <br /> Ringgenberg Drive. <br /> The access to the driveway shall have gates securely locked when the extraction site is not in <br /> operation. The site shall be signed "no trespassing." <br />
The URL can be used to link to this page
Your browser does not support the video tag.