|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2015-00570
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2015
>
DCPZP-2015-00570
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2015 12:54:54 PM
Creation date
8/19/2015 11:51:30 AM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2015-00570
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(y /4)J <br /> difikir 7/15/2015 <br /> VP.e0roBnoax <br /> W931052325093_0220 <br /> Doc ID:38838201,507150737725 <br /> BUILDING CORP. Phone: (608)845-9700 <br /> ClearyBuilding.com Fax: (608) 845-7070 Cleary/Owner Project Contract - Erected <br /> • <br /> Truss Type <br /> RSNEII IL[I1ttN k'.Y <br /> a- - , 100'40. Di�4,T of it ins r Y t hir i t <br /> F <br /> Note: Clearance may be reduced by finished floor height. <br /> ,,.•:;R Roof Pitch: <br /> --'° y_;,-Ly� Roof Peak Height: c� 19; <br /> €i <br /> 1 ` "A" = Actual Eave Height: <br /> uI "B" = Truss clearance at heel: 11' 0"cr <br /> i (Truss clearance = 1'-0" less than nominal eave height, in most cases. <br /> i <br /> 100'y'0" If nested purlins are used, truss clearance will be increased by 4".) <br /> Raised Lower Chord Truss(RLC) "C" =Truss clearance at center: 13' 1" <br /> (Truss clearance at the center of the bulding with an RLC truss will be <br /> greater than the clearance at the heel.) See page PL-6 in the price <br /> book for clearances. <br /> Overhead Frameout & Headroom <br /> "D" = Bottom elevation (B.E.) of overhead door: 0'4" <br /> , „-,,"" The bottom of all overhead doors(top of finished floor) are <br /> `..- r recommended to be placed at 4" above the 100'-0" mark(100'-4"). In <br /> building without paved floors, B.E. of doors may be lower- e.g. 100'- <br /> ?`3?=:J4S 0". <br /> r r-( I "E" = Height of overhead door: 10' 0" <br /> Overhead door height = the height of the overhead door being placed <br /> i in this building. <br /> i I <br /> `" s Cr 1 "F" = Available headroom: 1' 10" <br /> v I Available headroom = the space available for overhead door tracks <br /> ' %r'a., and openers. If a ceiling is installed, headroom will be reduced by <br /> %, about 1". Door headroom requirements must be confirmed with the <br /> f <br /> X rrop (3F Fitir,iE(1 '' ; door supplier. <br /> FLOOR 14. 2 k, <br /> - e, Headroom calculation formula: <br /> n E. 2, (,B„) - (,.D") _ ("E:,) = ("F") <br /> t....., rr <br /> 8 (Truss Clearance) - (B.E.of overhead door) - (Overhead door height) = <br /> (Available headroom) <br /> Example: <br /> (10'-0") - (4") - (8'-0") = (1'-8" of available headroom) <br /> C-500 R <br /> v12/10 built with pride b e f o r e the is applied 15 of 21 <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.