|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2015-00579
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2015
>
DCPZP-2015-00579
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2015 2:51:28 PM
Creation date
9/8/2015 3:19:43 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2015-00579
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Dane County Water Resource Engineering Division <br /> DINAP - "Do I NEED A PERMIT" <br /> General Information: <br /> Date of Contact: 7/10/2015 <br /> Caller/Contact: Dan Waldner Phone#: (608) 235-4371 <br /> Landowner: Phone#: <br /> Contact Email: danieljwaldner @yahoo.eom <br /> Project Address: Pebble Valley Ct <br /> Location(Municipality): Bristol Section: 19 %: SE <br /> Parcel#: 0911-194-9581-6 <br /> Project Description: Construct a new SFR, driveway and detached garage. <br /> Planned Size of Disturbance: ? ft2 Planned Size of New Impervious: ? ft2 <br /> Water Resource Engineering Divisio Response: <br /> Based On Information Above the Project: J OES* O DOES NOT Require a Permit <br /> Determination Made by: QRLS QJDB OJAS QJAH O JRT QAJM OJRR <br /> Type of Permit Required: Erosion Control ❑Shoreland Erosion Control DStormwater Management <br /> ❑Disturbance >4000 ft2 0 xcavate/Fill>400 yds3 0 Disturbing 100' of ditch/channel <br /> 0 125'Long new access road/driveway El ubdivision Plat/CSM 0 20,000 ft2 New Impervious areas <br /> 0 Shoreland Zone Disturbance El Other: <br /> Basis for Determination: Project is not located in the shoreland zone and is exempt from <br /> m <br /> Ch. 14 permitting under s. 14.47(2)(a). <br /> Permit determination is based upon the information provided by caller/landowner on the date of contact. <br /> Changes in project size,scope or location may trigger changes to permit requirements. <br /> It is the responsibility of the owner to ensure all required permits have been obtained prior to commencing work. <br />
The URL can be used to link to this page
Your browser does not support the video tag.