Laserfiche WebLink
Sauer, Sarah <br /> From: Scott Lee <scottylee84 @gmail.com> <br /> Sent: Monday, August 31, 2015 9:50 PM <br /> To: Sauer, Sarah <br /> Subject: Fwd: Lee Drive <br /> Attachments: Lee Drive Slope.pdf;ATT00001.htm; Lee Union Valley Drive Detail R1.pdf;ATT00002.htm <br /> Begin forwarded message: <br /> From: TCP Chair <tcpchair @tds.net> <br /> Subject: Lee Drive <br /> Date: August 11 , 2015 8:49:10 PM CDT <br /> To: Scott & Kimberly Lee <scottylee84a,gmail.com> <br /> Cc: "tcpclerk tds.net" <tcpclerk@tds.net> <br /> Scott Lee <br /> The Town of Cross Plains Board approve, at their August 11, 2015 meeting, the driveway design for xxxx <br /> Union Valley Road with the following conditions: <br /> a. A variance from Town standard to leave the existing farm road slope (up to 5%) within the road right of way <br /> if TDS does not agree to relocate their line at their expense and there are not significant costs to lower because <br /> of bedrock. No erosion control issues are apparent with existing farm drive. <br /> b. The road meets the town road at town standards and all other town ordinance standards are met. <br /> c. Construction is per Fullcircle Engineering drawings PL1 dated 7/28/15 and PL2 dated 8/8/15 reflecting slope <br /> and drainage in the enclosed drawings. <br /> d. Owner is obligated to repair any future issues with water runoff or erosion onto town road and in right of <br /> way that result from construction of the drive. <br /> This email and attachments will be attached to your earlier Town Driveway application that established the <br /> drive access point. <br /> Best <br /> Greg Hyer <br /> Town Chair <br /> 1 <br />