Laserfiche WebLink
DANECOUNTY ZONING PERMIT ZONING PERMIT NO Page2of2 <br /> DCPZP-2015-00775 <br /> Conditions:l. THIS APPROVAL BY DANE COUNTY ZONING IS ONLY FOR THE PLAN AS <br /> PRESENTED. ANY MODIFICATION TO THE PROJECT REQUIRES THE EXPRESS WRITTEN <br /> APPROVAL BY DANE COUNTY ZONING. THIS PERMIT SHALL BE NULL AND VOID IF ANY <br /> MODIFICATIONS ARE MADE WITHOUT THE EXPRESS WRITTEN APPROVAL OF DANE COUNTY <br /> ZONING. INITIALS <br /> SURVEY REQUIREMENT: A LOCATION SURVEY IS REQUIRED TO VERIFY COMPLIANCE WITH <br /> ZONING ORDINANCE SETBACKS. THE SURVEY SHALL BE PREPARED BY A REGISTERED LAND <br /> SURVEYOR, AND MUST BE RECEIVED BY DANE COUNTY ZONING WHEN THE <br /> FOUNDATION/BASEMENT WALLS ARE COMPLETED, OR IF THE PROJECT DOES NOT INCLUDE <br /> FOUNDATION/BASEMENT WALLS, AT THE TIME THE LOCATION OF THE STRUCTURE IS <br /> ESTABLISHED, AND BEFORE ANY OTHER WORK IS DONE. LOCATION SURVEY TO INCLUDE <br /> BOTH ESCAPE WELLS AND THE MINIMUM REQUIRED SETBACK OF FIVE(5) FEET FROM THE <br /> WELLS TO THE SIDE LOT LINES. SITE PLAN TO BE AMENDED TO INCLUDE BOTH ESCAPE WELLS <br /> AND BOTH SIDEYARD SETBACKS. <br />