Laserfiche WebLink
A location survey, by a licensed surveyor, is required if your construction - <br /> is within 10 feet of a setback line. <br /> • You will need to hire a surveyor to prepare a location survey to verify the construction location. <br /> • The survey shall be done at the time when foundations or basement walls are completed. <br /> • A location survey shall be submitted to the zoning office before continuing work on the project. <br /> • Note: A location survey may add significant cost to your project. Please contact a Wisconsin Licensed Land Surveyor. <br /> you may need this if . . . <br /> 33' 33' I I <br /> I I <br /> Front Setback area S 72°57'40" E 254.01' F Side Setback area <br /> • /))) /�/��7T Rear <br /> r -Z/////,/,//////��%%i %i %i %i /� 1 Setback <br /> area <br /> O • O <br /> O <br /> 10 Feet 1- <br /> 0 Needs a / W <br /> eeee:�eee Location W <br /> Q w 1 w Survey 01_Setback <br /> to <br /> 0 I A N r O ] Propose 169.8 Q Addition O <br /> ifir 0 35. % _ is <br /> O —d a N <br /> I z <br /> — — —v� l/!1/!!/GaGYGG%GG%GGjLGI/1l!/!1/!1/ll�G1GG! <br /> co <br /> I Side Setback area N 72°57' 40" W <br /> I <br /> 33' 33' I I <br /> 1. I,the undersigned, hereby make application for a zoning permit only for the location and the work described herein and <br /> certify to the accuracy of that information. I further certify I am the property owner, or a duly authorized representative, <br /> and may sign this permit application on behalf of the owner(s) of said property, and I have read and understand all of <br /> the conditions of this permit and will construct the project in compliance with those conditions. I understand that failure <br /> to provide accurate information or to comply with any provisions of the permit renders it null and void and may result in an <br /> enforcement action. <br /> 2. I,the undersigned, hereby consent to the entry on the permitted premises by zoning inspectors of the Dane County <br /> Department of Planning & Development to determine compliance with the county's zoning ordinances.This consent is <br /> valid for the period commencing with issuance of this zoning permit and terminating with issuance of a certificate of <br /> compliance or until earlier revoked in writing by the owner of the property. <br /> PRINT: Owner/Agent DATE: <br /> g4,te4/7 C 1-f xs'4 I I _ /l , r 7 <br /> SIGNATURE: Owner/Agent <br /> &,e--1--047 ..-..Z..------;..-----C----r <br />