Laserfiche WebLink
Application Number:APP-38202 <br /> ZONING PERMIT NO. <br /> DANE COUNTY ZONING PERMIT Page 1 of 2 ZP20090629 <br /> OWNER INFORMATION ( AGENT/CONTRACTOR INFORMATION <br /> OWNER NAME PHONE AGENT/CONTRACTOR NAME PHONE <br /> DANIEL ENZ (608)279-8755 SAME AS OWNER (608)279-2997 <br /> BILLING ADDRESS (Number,Street) ADDRESS (Number,Street) <br /> 2944 WAUBESA AVE <br /> (City,State,Zip) (City,State,Zip) <br /> MADISON, WI 53711 <br /> E-MAIL ADDRESS 0C/i5 a E E-MAIL ADDRESS iD A E r.) <br /> LENZ @STARKHOMES.COM DENZ @UWHEALTH.ORG <br /> PARCEL NO. TOWNSHIP SECTION 1/4 1/4 1/4 <br /> 0610-054-2100-8 DUNN 05 SE Nw <br /> - :tel:/4:11'/A DI DI A 4- 1.11 HOUSE NO. ST.DIRECTION STREET NAME ST.TYPE <br /> (Assignment of new address is subject 3012 WAUBESA AVE <br /> to field verification.) <br /> LOT BLOCK C.S.M.NO.Qr PLAT NAME <br /> 10 1 PLAT: WAUBESA BEACH- <br /> ZONING DISTRICT PARCEL ACREAGE PROPOSED PROJECT: 8 New ❑Addition/Alteration CENSUS CODE <br /> R-3 0.27 AC REPLACE SFR IN SHORELAND DISTRICT 101 - SFR <br /> Description:____ _ <br /> CATEGORY Residential ❑Commercial ❑Agricultural SEWER SANITARY PERMIT NO. <br /> ❑ <br /> Other: Public ❑Private NOT READ <br /> ROAD CLASSIFICATION REZONE NO. C.U.P.NO. VARIANCE NO. DEED RESTRICTION <br /> D -- 3578 ❑Yes rAlo <br /> SHORELAND FLOOD ZONE WETLAND EC/SW NO. <br /> Yes ❑No ❑Yes No ❑Yes No REQUIRED <br /> HEIGHT(In Feet) BASEMENT 1.s FLOOR TOTAL SQUARE FEET <br /> 32.5'OA 1359 2343 5331 <br /> Sq.Ft. Sq.Ft. PROJECT COST <br /> NO.OF STORIES 2nd FLOOR 3rd FLOOR $ 350,000.00 <br /> 2 1629 0 PERMIT FEE <br /> Sq.Ft. Sq.Ft. $ 450.00 <br /> 1. I,the undersigned,hereby make application for a zoning permit only for the location and the work described herein and certify to the accuracy of that <br /> information. I further certify I am the owner of the property,or a duly authorized representative,and may sign this permit application on behalf of the <br /> owner(s) of said property, and I have read and understand all of the conditions of this permit and will construct the project in compliance with <br /> those conditions. I understand that failure to comply with any provision of the permit renders it null and void and may result in an enforcement action. <br /> 2. I,the undersigned,hereby certify that: <br /> • I have made a diligent inquiry into the applicability of any official map to the applicants'land; <br /> • No such official map is applicable,or,if such map is applicable,the approval of the appropriate city or village has been obtained; <br /> • I have not relied upon any statements of County employees in giving these assurances; <br /> • I understand the possible adverse consequences of erecting any structure within an officially mapped area without the proper approval of the city or <br /> village involved.Any zoning permit issued for a property located within an official mapped area for which the applicant has not obtained the proper <br /> permit from the appropriate village or city shall be null and void. <br /> 3. I, the undersigned, hereby consent to the entry on the permitted premises by zoning inspectors of the Dane County Department of Planning & <br /> Development to determine compliance with the county's zoning ordinances.This consent is valid for the period commencing with issuance of this <br /> zoning permit and terminating with issuance of a certificate of compliance or until earlier revoked in writing by the owner of the property. <br /> Owner&Agent hereby agree to comply with all Dane County SIGNAT E: Owner/Agent DATE: <br /> Ordinances.Any unauthorized change from the information ! /f <br /> or plans submitted will invalidate the permit. � //I %� ��_ a�'v <br /> OFFICE USE ONLY <br /> SURVEY REQUIRED? DATE ISSUED INITIALS 1st INSPE TION D T 1L INITIALS <br /> Yes ❑No 01 Oct 2009 KLS 1' i L (- <br /> DATE REVIEWED INITIALS 2nd INSPE TION D TE INITIAL <br /> Initials: S7/11! 'if Sr <br /> Conditions: 1.THIS APPROVAL BY DANE COUNTY ZONING IS ONLY FOR THE PLAN AS PRESENTEANY MODIFICATION TO THE PROJECT <br /> REQUIRES THE EXPRESS WRITTEN APPROVAL BY DANE COUNTY ZONING. THIS PERMIT SHALL BE NULL AND VOID IF i NY <br /> MODIFICATIONS ARE MADE WITHOUT THE EXPRESS WRITTEN APPROVAL OF DANE COUNTY ZONING.INITIALS <br /> 2.SURVEY REQUIREMENT: A LOCATION SURVEY IS REQUIRED TO VERIFY COMPLIANCE WITH ZONING ORDINANCE SETBACKS. THE <br /> SURVEY SHALL BE PREPARED BY A REGISTERED LAND SURVEYOR,AND MUST BE RECEIVED BY DANE COUNTY ZONING WHEN THE <br /> FOUNDATION/BASEMENT WALLS ARE COMPLETED,OR IF THE PROJECT DOES NOT INCLUDE FOUNDATION/BASEMENT WALLS,AT <br /> THE TIME THE LOCATION OF THE STRUCTURE IS ESTABLISHED,AND BEFORE ANY OTHER WORK IS DONE. <br /> 545-112(12/05) GCS-multi <br />