|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2009-00635
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2000s
>
2009
>
DCPZP-2009-00635
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2015 10:40:06 AM
Creation date
10/16/2015 1:08:23 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2009-00635
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Dane County Land Conservation Division <br /> DINAP - "Do I NEED A PERMIT" <br /> General Information: <br /> Caller/Contact: Mary Cushman Phone#: 798-2001 <br /> Landowner: Nancy Anderson Phone#: <br /> Contact email: Ijcushman @charter.net <br /> Project Address: 8518 Ellington Way <br /> Location: Township: Middleton Sec: 05 '/, NE <br /> Parcel#: 0708-051-2196-0 <br /> Project Description: Detached garage addition <br /> Planned Size of Disturbance: <4000 ft2 Planned Size of New Impervious: <4000 ft2 <br /> Land Conservation Division Response : <br /> Based on information above the project: DOES* ✓DDOES NOT require a permit <br /> Determination Made By: I JAH DAS DDB DRT DRLS AJM <br /> *Type of permit required: DEC DES DSM OSE OSS <br /> 0 Disturbance >4000 ft2 DSlopes> 12% DExcavate/Fill>400 yds3 <br /> 0 Disturbing 100' of ditch/channel 0125' New road/driveway OShoreland Zone disturbance <br /> 0 Addition of 20,000 ft2 New Imp. ❑Subdivision Plat/CSM DOther: <br /> Basis for Determination: NW half of lot is outside the shoreland zone(left side of lot when facing the front of the existing home). <br /> The garage is to be constructed and all land disturbing activity is to occur on portions of the lot that are outside the shoreland zone. <br /> Permit determination based upon information provided by caller/landowner. Changes in project size, scope or <br /> location may trigger changes to permit requirements. It is the responsibility of the owner to ensure all required <br /> permits have been obtained prior to commencing work. <br />
The URL can be used to link to this page
Your browser does not support the video tag.