Laserfiche WebLink
JUL 28 '98 08:57AM TCWN OF WESTPORT P.3/4 <br /> Zoning Petition 7280 Public Hearing 7/28/98 <br /> The above petition is slit jest to the following conditions: <br /> 1. Delayed effective dat <br /> 2. A drainage easement should be provided from the outlet of the 24" CMP to the south property <br /> line following the nat ural drainage course 20 feet wide or all wetland,whichever is greater <br /> 3. Require reclamation plan for existing quarry located on proposed lot 1 as shown on attached <br /> preliminary survey <br /> 4. No further sub-division of the two lots as shown on the attached preliminary survey <br /> 5. Require inside storag:of all vehicles and equipment <br /> 6. Restricted to propose 1 use of agricultural trucking <br /> I <br /> I <br /> I <br />