Laserfiche WebLink
Planning & Development <br /> - Dane County P g <br /> ' • y iS <br /> 1 City-County Building, Madison, Wisconsin 53709 <br /> cosy " Planning <br /> Room 116,608/266-4251 <br /> Zoning <br /> Room 116,6081266-4266 <br /> Community Development <br /> RULES FOR THE ISSUANCE OF A DANE COUNTY ZONING PERMIT Room 421,608261-9781 <br /> Records&Support <br /> Room 116,608/266-4251 <br /> 1. If the proposed building is to be served by an on-site sewage disposal system, <br /> evidence of compliance with Chapter 46, Dane County Private Sewage System <br /> Ordinance and Chapter ILHR 83 of the Wisconsin Adminis>ralive Code shall be by a <br /> valid Dane County septic system permit and an approved Wisconsin form PLB-67. <br /> These permits are placed on file at the Zoning Department following issuance by the <br /> Dane County Environmental Health Department. <br /> 2. A legal description of the land is required either by a metes and bounds description, a <br /> certified survey map number or a lot in a subdivision. A review of all metes and <br /> bounds descriptions of land will be made to determine if the provisions of Chapter <br /> 75,Dane County Subdivision Ordinance have been met. <br /> 3. Culvert or access permits from the appropriate highway authority, if applicable, shall <br /> be included with an application for a zoning permit. <br /> 4. A plot plan must be drawn to scale showing the lot lines and lot dimensions, and the <br /> location and size of all existing and proposed buildings or additions thereto and their <br /> distances from lot lines. If the lot is not served by public sewer,the location and size <br /> of the on-site sewage disposal system and the location of the well shall be shown on <br /> the plan.. <br /> 5. A copy of the floor plan will be kept in the Zoning Department files. 1 <br /> 6. Provide an estimation of the cost which includes the structure and mechanicals. <br />