Laserfiche WebLink
Brush is also collected, and will be chipped at the Recycle Center. These wood chips will be used to <br /> cover the site. The wood chips can also be picked up by City residents for their use. <br /> Operation&Maintenance Manual: A operation and maintenance manual will be kept at the site in the <br /> attendant's building. The manual will explain procedures to be followed during day-to-day operations <br /> as well as procedures in the event of a spill. Procedures for handing material left when the site is not in <br /> operation will also be included in the manual. The manual will list the phone numbers of emergency <br /> personnel and responsible parties. <br /> Buffer: The site will be fenced and buffered with trees/shrubs on the west side along the park,on the <br /> north side along the driveway, and on the east side behind the landscaping contractor. The site is <br /> inaccessible from the south. <br /> Erosion Control During Construction: Erosion control during construction will consist of installing a <br /> gravel tracking pad in the southeast corner of the site,and using silt fence,bales,or mulch to prevent soil <br /> which washes off the sides of the fill (existing site fill) from washing into the wetland or creek. <br /> 3 G:\projects\30s\36\369834\stm_rpt.wpd <br />