Laserfiche WebLink
MADISON SAND & GRAVEL COMPANY, Inc. <br /> Washed Sand & Gravel — Fill Sand & Dirt — Limestone — Trucking <br /> Telephone(608) 244-6726 or(608) 846-4333 <br /> 5349 Norway Grove School Road, DeForest, Wisconsin 53532 <br /> William & Diane Wipperfurth <br /> and <br /> Madison Sand & Gravel Co. , Inc. <br /> "SUMMARY" <br /> 1. 8 . 99 Acres of extraction area, estimate of 5 acres of sand and <br /> gravel . With an estimate of 198 , 000 yards of raw material . <br /> 2 . Daily operation from 6 : 00 am to 5 : 00 pm. <br /> 3 . The Duration of this extraction site will be five (5) years, <br /> with a majority of the extraction and hauling in the winter <br /> months . <br /> 4 . There will be one wheel loader on site to remove the natural <br /> glacier deposit of sand and gravel . <br /> 5 . We will have between 7 and 15 trucks hauling approximately <br /> 10 loads each per day. Average of 70 loads with a maximum <br /> of 150 loads per day. <br /> 6 . We estimate that it will take us 10 months of actual extraction <br /> to exhaust the glacier deposit . see calculations below <br /> a. 70 loads @ 14 yards per load = 980 yards per day. <br /> b . 198 , 000 yards @ 980 yards per day = 202 . 04 days <br /> c . 202 . 04 days @ 5 days per week = 40 . 41 weeks <br /> d. 40 . 41 weeks @ 4 weeks per month = 10 . 10 months <br /> 7 . The erosion will be self-contained in the 8 . 99 acres as <br /> explained in our "Erosion Control Plan" . <br /> 8 . The extraction site will be 2 feet above the water table . <br /> 9 . The land, per our reclamation plan, will be returned to <br /> Agriculture use when extraction is completed. <br /> 10 . We are working with Dane County Highway Department to ensure <br /> safety on the Hwy P pit entrance . <br /> 11 . The storage of diesel fuel will be limited to a maximum of 500 <br /> gallons . An approved fuel tank will be supplied from Danco FS . <br /> Temporary storage tank - No spill containment required. <br />