Laserfiche WebLink
DANE COUNTY ZONING PERMIT ZONING PERMIT NO. Page 2of2 <br /> ll DCPZP-2015-00743 <br /> Conditions:l. THIS APPROVAL BY DANE G;OUNTY ZONING IS ONLY FOR THE PLAN AS <br /> PRESENTED. ANY MODIFICATION TO THE PROJECT REQUIRES THE EXPRESS WRITTEN <br /> APPROVAL BY DANE COUNTY ZONING. THIS PERMIT SHALL BE NULL AND VOID IF ANY <br /> MODIFICATIONS ARV rDE WITHOUT THE EXPRESS WRITTEN APPROVAL OF DANE COUNTY <br /> ZONING. INITIALS <br /> BASE FLOOD ELEVATION DETERMINATION: 892 FEET AMSL • <br /> LOWEST LEVEL ELEVATION MUST BE CONSTRUCTED TO AN ELEVATION OF 894 FEET AMSL OR <br /> HIGHER. <br /> 15 FOOT PERIMETER AROUND FOUNDATION TO BE CONSTRUCTED TO AN ELEVATION OF AT <br /> LEAST 893 FEET AMSL. <br /> II <br />