|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2015-00857
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2015
>
DCPZP-2015-00857
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2015 3:52:08 PM
Creation date
10/23/2015 4:07:09 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2015-00857
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Dane County Water Resource Engineering Division <br /> DINAP - "Do I NEED A PERMIT" <br /> General Information: <br /> Date of Contact: 10-21-15 <br /> Caller/contact: Freddy Frederick- JMF Custom Homes Phone#: 608-212-5340 <br /> Landowner: Klein-Budenz Phone#: <br /> Contact Email: freddy.jmfcustomhomes @gmail.com <br /> Project Address: Sun Valley Pkwy <br /> Location: Township: Montrose Sec: 12 1/4 <br /> Parcel #: 0508-121-8610-0 <br /> Project Description: Construction of SFR <br /> Planned Size of Disturbance: < 4000 ft2 Planned Size of New Impervious: ft2 <br /> Water Resource Engineering Division Response : <br /> Based on information above the project: ❑DOES* 0 DOES NOT require a permit <br /> Determination Made By: El RLS ❑JDB 19 JAS ❑JAH ❑JRT ❑AJM ❑JRR <br /> *Type of permit required: ❑EC El SM ❑SE <br /> ❑Disturbance >4000 ft2 ❑ Excavate/Fill >400 yds3 ❑ Disturbing 100' of ditch/channel <br /> 0 125' Long new access road/driveway❑ Subdivision Plat/CSM ❑ 20,000 ft2 New Impervious areas <br /> ❑Shoreland Zone Disturbance ❑ Other: <br /> Basis for Determination: Project area is outside the shoreland zone and does not <br /> trigger the erosion control requirements of DCCO Ch. 14 or Ch 11 <br /> Permit determination is based upon the information provided by caller/landowner on the date of contact. <br /> Changes in project size, scope or location may trigger changes to permit requirements. <br /> It is the responsibility of the owner to ensure all required permits have been obtained prior to commencing work. <br />
The URL can be used to link to this page
Your browser does not support the video tag.