|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2015-00854
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2015
>
DCPZP-2015-00854
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2015 3:53:05 PM
Creation date
10/26/2015 11:01:21 AM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2015-00854
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8 ► ? Water Resource Engineering Division <br /> . Dane County Land&Water Resources Department <br /> Jeremy Balousek,P.E.,Division Manager <br /> DATE: September 25, 2015 <br /> TO: Waylon Kannenberg <br /> Blue Vista Farms, LLC <br /> Digitally signed by Jeremy Balousek P.E. <br /> FROM: Jeremy Balousek, P.E. Jeremy DN:cn=Jeremy BalousekDE,o=Dane <br /> County,ou=Land and Water Resources <br /> n Dept., <br /> Balousek, r,E email=balou eke ounryo dace com, <br /> c=US <br /> Date:2015.09.25 10:17:46-05.00• <br /> RE: Wood Ger Mini-Warehouses Lot 7—Stormwater Management Plan, <br /> SM2015-0339 <br /> Associated Permit EC2015-0338 <br /> The submitted stormwater management plan meets the needs of the site. The plan includes the <br /> following requirements: <br /> 1. A bioretention basin must be constructed once the tributary area has been stabilized. <br /> Care must be taken to prevent runoff from disturbed areas from entering the facility, <br /> once it has been constructed and stabilized. The bioretention basin must be installed <br /> and planted as specified in the plan. <br /> 2. The areas identified on the plan must be erosion matted during final site stabilization. <br /> The erosion matting must meet the class and type specified in the plan. <br /> 3. The maintenance agreement for permanent stormwater management practices must be <br /> recorded with the Register of Deeds and a financial security document for 110% of the <br /> expected cost of erosion control and stormwater management ($34,800) must be <br /> submitted prior to permit issuance. <br /> 4. As-built plans and certification, performed by a professional engineer, will be required <br /> for all permanent stormwater management practices and facilities. <br /> This permit does not expire. This review is for the stormwater requirements of Chapter 14, <br /> Dane County Code of Ordinances only and other approvals may be necessary. The applicant <br /> must obtain a permit card from the Water Resource Engineering Division counter and display it <br /> on the site. <br /> Cc: Mike Calkins, P.E., Synder &Associates, Inc. (email) <br /> Eric Rortvedt, P.E., Wisconsin Department of Natural Resources (email) <br /> Lyman F.Anderson Agriculture&Conservation Center <br /> 5201 Fen Oak Drive,Room 208,Madison,Wisconsin 53718-PH:608/224-3730,FAX:608/224-3745 <br /> http://lwrd.countyofdane.com/wred/ <br />
The URL can be used to link to this page
Your browser does not support the video tag.